energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  FNCCI takes credit for resolving standoff over unpaid electricity dues of industries

The longstanding standoff between the Nepal Electricity Authority (NEA) and defaulting industries over the dues for the usage of dedicated feeders and trunk lines seems likely to be resolved after the government and the industrialists agreed on the proposal forwarded by the Federation of Nepalese Chambers of Commerce and Industry (FNCCI).

In a meeting with Prime Minister Sushila Karki on Monday, the representatives from the umbrella organisation of the private sector offered the government to pay the first installment of the dues as security deposit on condition that the state-owned power utility reconnects the electricity lines to manufacturing plants. Speaking at a press conference organized by the FNCCI on Tuesday, the industrialists expressed their consent over the federation’s proposed midway solution.

Raghu Nandan Maru, president of the Nepal Cement Manufacturers’ Association, said they have taken the FNCCI’s offer positively. “We are ready to pay the first installment of our dues only as a security deposit to Nepal Electricity Authority (NEA),” he said.

On behalf of the industrialists, the FNCCI has proposed the government to consider the first installment out of 28 breakdown amounts as deposit. Similarly, the manufacturers have demanded the NEA to resume electricity supply to their production plants after they pay the portion of the due.

FNCCI President Chandra Prasad Dhakal said the accord has been reached on the issue following a long discussion with high level government authorities. “An understanding has been reached between the private sector and the government bodies to resolve the issue,” Dhakal said.

He added that the private sector has also demanded the government to form a judicial commission to solve the issue permanently. “The commission is needed also to address the economic problems like reduction in employment and hurdles in production and export from the country, surfaced in the new scenario,” said Dhakal.

In August 2015, the NEA introduced a premium tariff for factories using electricity through dedicated feeders and trunk lines, citing frequent power outages at the time. The decision required high-energy-consuming industries to pay premium charges on top of the regular fees for uninterrupted power supply.

The NEA has been struggling to recover these dues for more than a decade after the defaulting firms refused to pay the premium charge for using electricity during the peak time of loadshedding.

After the industrialists did not appear for settlement of dues even after the end of the recent deadline on October 19, the NEA disconnected electricity supply lines to 25 manufacturing firms, but later reconnected the lines to two industries upon payment of first installment.

[ 4 November, 2025 / nagariknetwork.com ]   
 
 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries