energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Sikta makes 50% progress in 20 years

The long-awaited national pride project, Sikta Irrigation Project, under construction in Banke district, has completed 50 per cent of its total works in the span of 20 years.

According to Project Director Raju Acharya, both the project’s scope and cost have expanded over time, leading to an extension of the construction period. He said that 50 per cent of the total work had been completed so far, and the remaining construction was progressing rapidly.

According to Acharya, construction of 45 kilometres of the western main canal have been completed, while 37 kilometres out of 53 kilometres of the eastern main canal have been finished, marking half of the project’s overall completion. He further informed that the remaining canal and branch canal works were being carried out at an accelerated pace.

Currently, large structures along both the eastern and western main canals are under construction, and expansion of branch and sub-branch canals is ongoing.

After a prolonged legal dispute, the project has also resumed the construction of the Duduwa Irrigation System in the western region. Once operational, this system is expected to provide irrigation facilities to around 16,000 hectares of agricultural land across Nepalgunj, Duduwa, and Janaki rural municipalities. Although the initial contract for Duduwa was signed in 2016, it was later terminated due to non-performance by the contractor. A new tender had since been called to resume the works.

Acharya said that the project was preparing to expedite the remaining construction of the eastern main canal, expansion of branch networks, and maintenance works.

Upon receiving financial approval from the Ministry of Finance, the project plans to move forward with an additional construction programme worth around Rs. 5 billion. The new plan includes expansion of the fifth, sixth, and seventh branch canals, as well as reconstruction of older structures.

Meanwhile, water has already been released into sections of both the eastern and western main canals, as well as some branch canals. This has allowed many farmers in Banke, who once depended solely on rainfall, to cultivate up to three crops a year using irrigation water from the Sikta canals.

Local farmers expressed satisfaction with the progress. Ramsharan Tharu, a farmer from Rapti Sonari-4, said, “We used to depend entirely on rainfall, but now irrigation water from the canals has made farming much easier.”

Similarly, Amar Gharti Magar of Rapti Sonari-7 stated that even though the eastern canal is not fully completed, the project has already started transforming farmers’ lives. “From land that once produced barely enough to eat, we now grow enough to sell,” he said.

Another farmer, Rima Tharu from Rapti Sonari-5, shared that timely access to canal water has made farming more reliable. “We no longer have to wait for the monsoon, irrigation has made cultivation much easier,” she said.

The Sikta Irrigation Project began in the fiscal year 2004/05 with the aim of constructing a barrage on the Rapti River at Agaiya in Banke district. Once fully completed, the project will protect around 33,700 hectares of farmland on the western side and 9,000 hectares on the eastern side from drought, significantly boosting agricultural productivity in the region.

By Siraj Khan

[ 7 November, 2025 / risingnepaldaily.com ]   
 
 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries