energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  FNCCI–government agreement on electricity billing to be enforced, PMO confirms

The Office of the Prime Minister and Council of Ministers has directed the Ministry of Energy, Water Resources and Irrigation to implement the agreement reached between the government and the Federation of Nepalese Chambers of Commerce and Industry (FNCCI) regarding the long-running dispute over charges for ‘dedicated’ and ‘trunk’ electricity lines used by industrial firms.

According to the PM’s Office, a meeting held on 17 Kartik 2082 in the presence of Prime Minister Sushila Karki, Finance Minister Rameshwar Khanal, Energy Minister Kulman Ghising, Chief Secretary, and the FNCCI delegation had reached a verbal understanding to simplify payment procedures and allow an administrative review mechanism for disputed billing.

As per the agreement, industries that had their dedicated electricity lines cut by the Nepal Electricity Authority (NEA) over unpaid premium charges would be able to restore their power supply immediately after depositing the amount equivalent to one installment from the previously issued 28-installment schedule as a deposit, rather than as confirmed payment. This provision allows the disputed amount to remain under review while power supply is resumed.

FNCCI President Chandra Prasad Dhakal confirmed that industries depositing the required amount will retain the right to seek administrative review and pursue further legal remedies. “Industries can submit their deposit along with written objections and request for review. The agreement ensures continuity of industrial operation while the billing dispute undergoes due process,” Dhakal stated.

The dispute surfaced after NEA accused around two dozen industries of failing to pay additional premium charges for dedicated and trunk line usage. NEA subsequently disconnected the power supply of several units, prompting protests from industrial bodies who claimed the billing system was opaque and incorrectly applied.

Following the agreement, power connections have been restored to industries that have submitted the deposit amount.

With the Prime Minister’s Office now instructing formal implementation, the Ministry of Energy and NEA are expected to begin processing the deposit-based reconnection and review applications immediately. Business associations say this directive is a positive step toward preventing production shutdowns, unemployment risks, and supply chain disruptions in the industrial sector.

However, industrial leaders stress that structural clarity is still needed to prevent similar disputes in the future. They have urged the government and NEA to adopt transparent tariff mechanisms and ensure that dedicated line services are billed based on clear standards, not interpretations.

The PM’s Office has stated that the purpose of the directive is to ensure that “issues affecting national industrial production and business stability are resolved through dialogue, cooperation, and due legal process.”

[ 9 November, 2025 / fiscalnepal.com ]   
 
 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries