energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Baitadi Shines: 27,000 Homes Now Connected to Electricity

With the power supply to 7,000 households in 19 wards of five local levels in the district that were without electricity, the number of households in the district that were able to use electricity has reached 27,091.

Janardan Poudel, engineer at the distribution center, said that the Baitadi Electricity Distribution Center has implemented the programs in the last fiscal year of connecting electricity in some wards of the Pancheshwor Rural Municipality, Shivnath, Dilasaini, Dogadakedar Surnaya, and Sigas Rural Municipality.

He said, “I am working relentlessly in the village. I am transferring from Baitadi after providing electricity to 1,787 households. People have praised and thanked the Chief of Office for his personal dedication and work towards achieving the government’s goal of complete electrification of Baitadi within the next two years.”

There are a total of 49,428 households in the six rural municipalities and four municipalities of the district. Electricity is yet to reach 22,000 households in the district

Madhav Prasad Lekhak, Information Officer at the Baitadi Electricity Distribution Center, said that the construction of 33 kV substations in Bindraban, Sigas, and Sillegada, Dogadakedar, to electrify these households has reached the final stage.

He said that the goal is to fully electrify Baitadi district within the next one year.

In Baitadi, electricity reached the Baitadi district headquarters from India in 1985 (2042 BS) through an 11 kV transmission line.

Then, in 1990 (2047 BS), 200 kilowatts of electricity were generated from the Surnayagad small hydroelectric power plant in Patan, Baitadi, which has now shut down.

There is a statistics of connection of 33 kv National transmission line in the year 1999.

After the completion of the 40-megawatt Upper Chameliya Hydropower Project, A total of 96.5 megawatts of electricity has been generated on the Chameliya River, where Chameliya generates 30 megawatts of power, Upper Chameliya 40 megawatts, 10 megawatts from Makrigad, 8.5 megawatts from Naugad, and 8 megawatts from Upper Apargad.

After 53.79 megawatts of electricity generated from the Kalanga River in Bajhang was also connected to the Chameliya grid, 150 megawatts of electricity over the Baitadi sky has been connected to the national transmission line.

Although the local level has tried to provide electricity through the consumer committee for the past five years, they are now seeking help from the Baitadi Electricity Distribution Center after the lights failed to turn on due to substandard work.

After the contractor ran away when Pancheshwor Rural Municipality tried to expand electricity through a contract, electricity is now available in four wards, including in the rural municipality, thanks to the initiative of the distribution center.

Rising Nepal

[ 26 November, 2025 / nepalenergyforum.com ]   
 
 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries