energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Financial management of 61 MW Nar Khola Hydro Project completed

The financial management of the 61 MW Nar Khola Hydropower Project, to be built with the main investment of Singati Hydro Energy Limited, has been completed.

On Monday, five banks led by Kumari Bank signed an agreement to invest Rs. 9.5 billion in loans for the construction of the project.

Under the leadership of Kumari Bank, Nepal SBI Bank, Agricultural Development Bank, NIC Asia Bank, and Muktinath Bikas Bank will invest in the project.

Chairman of Nar Khola Hydro Energy Pvt. Ltd., Batu Lamichhane, and Kumari Bank’s Chief Regional Credit Officer, Arpan Pokharel, jointly signed the investment agreement at a function held today.

The Nar Khola Hydropower Project, with an installed capacity of 61.11 MW, will be developed by integrating the waters of Nar Khola and Soti Khola in Narpa Bhumi and Nason Rural Municipalities of Manang.

According to the project promoter company, Nar Khola Hydro Energy Pvt. Ltd., all procedures required for construction have been completed. The project has already signed a power purchase agreement (PPA) with the Nepal Electricity Authority.

The Nar Khola Hydropower Project will have a gross head of 588.82 metres and will generate 366.48 gigawatt-hours of electricity annually. Three turbines of 20.37 MW capacity each will be used to generate a total of 61.11 MW of electricity.

The headrace tunnel of the project will be about 8 kilometres long. The dam structures will be constructed in Narpa Bhumi Rural Municipality, while the power plant will be located in Nason Rural Municipality. The project will sell electricity worth Rs. 2.1 billion each year.

The electricity generated will be connected to the Nepal Electricity Authority’s substation currently under construction in Dharapani, Manang. The total estimated cost of the project is Rs. 12.84 billion, of which bank loans will amount to Rs. 9.63 billion and equity capital will be Rs. 3.21 billion.

The main equity investment will come from Singati Hydro Energy Limited. The project has already begun constructing the access road. According to the company, the construction of the main infrastructure will begin within next three months, with a target to complete the project within three years.

[ 2 December, 2025 / risingnepaldaily.com ]   
 
 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries