energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Sunkoshi-3 Hydropower: Nepal-Bangladesh JV Set to Begin Construction

The 683 MW Sunkoshi-3 reservoir-based hydropower project, identified on the border of Kavrepalanchok and Ramechhap, is now on a clear path toward construction. Nepal and Bangladesh have agreed to jointly build the project.

The meeting of the Nepal–Bangladesh Energy Secretary-level Joint Steering Committee (JSC), held in Dhaka, Bangladesh on November 27, decided to move forward with the investment process to advance the project’s construction.

During the seventh meeting of the JSC - which oversees bilateral discussions on energy cooperation between Nepal and Bangladesh - it was decided to quickly finalize the Joint Venture Agreement (JVA) for the project’s development. Additionally, Bangladesh will form an expert committee to evaluate the project.

From Identification to Development

The Japan International Cooperation Agency (JICA) first identified the project in 1985 during the Koshi River Water Resources Development Study. Although JICA updated the study in 2014, a formal feasibility study began only in 2017.

In 2021, the Government of Nepal proposed developing the project in partnership with Bangladesh. Since then, studies, reviews, and environmental clearance processes have moved forward through a secretary-level mechanism.

Survey License and Investment Structure

The Department of Electricity Development under the Ministry of Energy granted a survey license to the Nepal Electricity Authority in November/December 2023, valid until December 10, 2025. The Authority paid about 700 million rupees to the government for the survey rights.

The estimated cost of the project is about USD 1.458 billion, of which USD 580 million is allocated for civil structures, USD 174.9 million for hydro-electromechanical and transmission infrastructure, and USD 370 million for social and environmental management.

Dam, Reservoir, and Technical Features

A 180-meter-high dam will be constructed at Lubhughat, about one kilometer from Nepalthok on the BP Highway, on the border of Khandadevi (Ramechhap) and Temal Rural Municipality (Kavre). The dam will block the Sunkoshi River, creating a reservoir roughly 45 kilometers long.

The reservoir will extend upstream to above Balefi Bazaar in Sindhupalchowk and to Sipaghat on the Indrawati River. About 570 cusecs of water will be diverted to the powerhouse through a 1.1-kilometer-long, 9-meter-diameter tunnel, generating 683 MW of electricity. Annual generation is expected to reach 2.3562 billion units.

EIA Approval and Social Impact

The legal pathway for project construction opened after the Ministry of Forests approved the Environmental Impact Assessment (EIA) in October/November 2022. According to the EIA report, residents of 45 wards across 13 local levels in four districts will be affected. A total of 3,237 hectares will be inundated, including around 3,300 hectares of private land and 655 hectares of forest area. The study estimates that about 11,700 people will be displaced.

Investment Summit and Energy Diplomacy

International interest in the project increased after it was included in the Investment Summit held in Kathmandu in 2018. Since the Energy Cooperation Agreement of 2018, Bangladesh has shown strong interest in developing reservoir-based hydropower projects with Nepal. For this reason, both countries appear eager to finalize the upcoming JV agreement, recognizing energy as a key pillar of diplomatic cooperation.

Urjasanchar

[ 2 December, 2025 / nepalenergyforum.com ]   
 
 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries