energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Construction Begins on Access Road for Mudikhola Hydropower

In Dhaulagiri Rural Municipality-4 of Myagdi, construction of the access road for the 14-megawatt Mudikhola Hydropower Project has begun.

At the confluence of Myagdi and Gurja Khola, Yam Bahadur Gharti, the ward chairperson of Dhaulagiri Rural Municipality-4, inaugurated the construction of the access road. The promoting company, Everest Energy and Infrastructure, has stated that an eight-kilometer access road will be constructed from the confluence to the dam construction site located at Arche’s Fedi.

Ram KC, the contact person of the promoting company, stated that once the access road from the powerhouse to the dam site is completed, the construction of the dam, tunnel, and powerhouse will begin through a civil contractor.

‘Along with the construction of the access road, work on financial management and the selection of civil and electromechanical contractors has also been progressing simultaneously,’ he said. ‘Preparations are also underway to start building the necessary infrastructure at the project site for storing explosives required for tunnel construction and for establishing a post of the Nepal Army for security.

The project will have a four-kilometer tunnel, with the dam located at Arche’s Fedi and the powerhouse at the confluence of Gurja and Myagdi rivers. The project, which has already signed a power purchase agreement, has obtained a generation license from the Department of Electricity Development. The head of the dam and powerhouse is 337 meters. KC stated that the estimated cost of the project is NPR 16 crore per megawatt.

The electricity generated from this run-of-the-river project will be connected to the national grid through the 132 kVA substation constructed by the Nepal Electricity Authority in Dandakhet. An eight-kilometer-long transmission line will be built from the confluence to Dandakhet in collaboration with other ongoing projects on the Myagdi and its tributary rivers.

Besides Mudikhola, rivers flowing through the geography of Dhaulagiri Rural Municipality-4 host other ongoing hydropower projects, including the 53.5-megawatt Upper Myagdi-1 and the 46.25-megawatt Upper Myagdi Hydropower Project. Ward Chairperson Gharti stated that the 65-megawatt Myagdi Khola Hydropower Project is preparing to construct an access road connecting the dam from Jeltung to the confluence.

Biznessnews

[ 13 December 2025 / nepalenergyforum.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries