energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Seti River–3 Hydropower Project to Be Built with NPR 19.5 Billion Investment

Chilime Hydropower Company Limited, through its subsidiary, is planning to construct the 87-megawatt Seti River–3 semi-reservoir hydropower project in Sudurpashchim Province.

To move the project forward, Chilime has decided to transfer the electricity generation license to its subsidiary, Chilime Seti Hydropower Company Limited. A special proposal to this effect will be presented at Chilime’s 29th Annual General Meeting scheduled for Poush 30. Once approved by the meeting, the license will be officially transferred to Chilime Seti.

The estimated cost of constructing the semi-reservoir Seti River–3 project is NPR 19.66 billion. Studies show that the project will generate an average of 482.5 million units of electricity annually.

The target is to begin electricity generation within the next five years, specifically by May 10, 2028. The project will have a one-hour peaking time. Its design discharge is 84.60 cubic meters per second, and the total head will be 124 meters. The project’s physical structures are proposed to be located on the left bank of the Seti River in Jayaprithvi Municipality.

The project’s dam will be 67 meters long and 16 meters high. Three generators, each with a capacity of 29 megawatts, will be installed at the powerhouse.

The electricity generated by the project will be connected to the Bajhang Substation at Kailash through a 12-kilometer-long 132 kV transmission line. According to Chilime, the project will affect Jayaprithvi in Bajhang as well as Khaptchhanna Rural Municipality, Masta Rural Municipality, Chhabispathivera Rural Municipality, and Thalara Rural Municipality.

Chilime Hydropower is advancing four hydropower projects through its subsidiary companies. These include the 87-megawatt Seti River–3 semi-reservoir project, the 81-megawatt Budhigandaki project, the 91-megawatt Budhigandaki project, and the 45-megawatt Syarkhalo project.

Urjasanchar

[ 27 December 2025 / nepalenergyforum.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries