energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Spark Hydropower’s Tamor-Mewa Project to Reach 145 MW Capacity

The Tamor-Mewa Hydropower Project has been set to generate 145 megawatts of electricity.

Spark Hydropower, which initially received a 128 MW permit, has announced plans to produce an additional 17 MW using water from the Tamor River.

Bhanendra Limbu, founder chairman, director, and public relations chief of Spark Hydro Electric Company Limited, explained that the project’s original design envisioned channeling water through a 5-kilometer tunnel from near Thangne Kholsan to a powerhouse near Guheli.

The current plan, however, involves diverting water from Hangdewa Katahare via a 1.5-kilometer headrace pipe, discharging it into the powerhouse in Guheli through an underground tunnel near Thangnekhola. “Changes during the initial study are common in hydropower projects, and the same has happened here,” Limbu said.

Although the main structures will be underground, the powerhouse itself will be above ground. Limbu noted that 22 percent of the work has been completed so far, including the basic infrastructure of the powerhouse, intake structures, main office, staff and worker accommodations, and the main access road, which is now complete up to the gravel level. Blasting work on the main structure is expected to begin within the next two and a half to three months.

At a press conference in Phungling on Sunday, Limbu projected that electricity generation would begin by October 11, 2025, as work progresses steadily. He added that the initial feasibility study had estimated a generation capacity of 101 MW by combining Tamor and Mewa water.

Limbu said that preparations for the required blasting have begun and that tunnel construction will commence once army barracks are set up in two and a half to three months. The total project cost is estimated at NPR 26 billion, with 75 percent (NPR 17.68 billion) financed through bank loans and financial institutions, and the remaining 25 percent (NPR 8.32 billion) covered by equity.

“All work so far has been funded from our own capital,” Limbu said, adding that the project, built at a comparatively lower cost than other hydropower projects, is expected to cost less than NPR 180 million per megawatt. Partner banks for the project include Machhapuchhre, Krishi Bikash, Nepal SBI, Jyoti Bikash, ICFC Finance, Nepal Finance, and Goodwill Finance Limited, under the leadership of Siddhartha Bank Limited.

SPARK received its production license from the Department of Electricity Development on October 11, 2020, and signed a Power Purchase Agreement (PPA) with the Nepal Electricity Authority on October 11, 2023. The foundation stone was laid on May 23, 2024, and construction has since begun.

Electricity generated from the project will be connected to the substation in Dhungesanghu, Maiwakhola Rural Municipality. Limbu added that IEE work for the transmission line has started, and a technical study is underway to extend power from underground cables to the transmission line.

Kantipur

[ 28 December 2025 / nepalenergyforum.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries