energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Boost to Nepal’s Energy Independence: 72.5 MW Hydropower Projects in Final Stage

A total of 72.5 megawatts of electricity from two major hydropower projects in Nepal is set to be connected to the national grid. As the demand for electrical energy continues to rise in the country, these domestically funded projects are in the final stage of preparation to come into operation.

The 50-megawatt United Mewa Hydropower Project, constructed by United Mewa Khola Hydropower Company, and the 22.5-megawatt Thulo Khola ‘A’ Hydropower Project, developed by Thulo Khola Hydropower Company, are in the final stage of electricity generation. Internal testing of these projects has been completed, and they are now in the process of obtaining operating approval and preparing for grid connection. Once their electricity is added to the national grid, it is expected to significantly improve the country’s energy supply.

Once electricity generation begins from these projects, it is believed that the growing pressure of electricity imports—especially during the winter season—will be reduced. At present, Nepal imports electricity from India during the dry season. With an increase in domestic production, imports are expected to decline, which will also help in saving foreign currency.

According to Ashish Thapa, Executive Chairman of United Mewa Khola Hydropower, and Narendra Ballav Pantha, Executive Chairman of Upper Thulo Khola Hydropower, both projects will soon come into operation and contribute to the country’s energy consumption needs as well as the promotion of domestic investment. These projects are considered important for reducing dependence on electricity imports and increasing the utilization of domestic energy resources.

The government has set a goal to increase hydropower generation in the coming years and build a self-reliant energy system. The timely completion of medium-capacity projects such as United Mewa and Thulo Khola is considered an important step toward achieving this objective.

Once these projects come into operation, it is expected that not only will the national transmission system be strengthened, but there will also be positive impacts on the industrial sector, household consumers, and rural electrification.

This project is located in Taplejung. The tunnel construction work was carried out by South Asian Infrastructure Company. Electricity generated from the project will be connected to the Dhungesanghu Substation of the Koshi Corridor. The company itself has constructed the required 7-kilometer-long transmission line from the powerhouse to the substation.

Studies show that the project will generate 97.424 gigawatt-hours of electricity in winter and 205.587 gigawatt-hours during the monsoon, producing a total of 303.011 gigawatt-hours of electricity.

The estimated cost to complete the project is Rs 9 billion. Of the total cost, 75 percent—equivalent to Rs 7 billion—has been financed through loans from banks and financial institutions, while the remaining 25 percent, or Rs 2 billion, has been invested as equity. The project has received loan investments led by Citizens Bank, along with Kumari Bank, Nepal Investment Mega Bank, Nepal Bank, Nepal Infrastructure Bank, Siddhartha Bank, Nepal SBI Bank, and Civil Bank.

This project is one of the “Super Six” projects that the government awarded to the private sector through a competitive bidding process for construction.

22.5-Megawatt Thulo Khola Project

This project is located on the border of Ghugunga-7 Chimkhola and Ward No. 8 Kuinemangle in Myagdi. The construction of the project’s infrastructure was carried out by Dev Urja Construction Pvt. Ltd.

Water from the dam built on the Raghuganga River above Sugurthala will be channeled through a penstock pipeline to the powerhouse located at the base of the Seti Valley, where it will be used to generate electricity.

The estimated cost of this project is Rs 3 billion. Of this, 30 percent has been invested by the promoter, while the remaining 70 percent will be financed through a financial agreement, with Agriculture Development Bank and Machhapuchhre Bank investing under the leadership of Citizens Bank.

Urjasanchar

[ 13 January 2026 / nepalenergyforum.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries