energyNP.com  
Tel
98510-91900¡¡
Email
energyNP@hotmail.com¡¡
Menu

 
 
News  
Back to energy news list >>>
 

 
 
¡¡Air Conditioner
¡¡Battery
¡¡Booster Pump
¡¡Charger
¡¡Cold Storage Room
¡¡Electric Power Tools
¡¡Electric Water Heater
¡¡Garbage Disposal
¡¡Station
¡¡Generator
¡¡Heat Pump
¡¡Inverter
¡¡Power Supply
¡¡Rectifiers
¡¡Self Priming Pump
¡¡Solar Energy
¡¡Solar Water Heater
¡¡Transformer
¡¡Treadmill
¡¡UPS
¡¡Voltage Stabilizer
¡¡Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Locals demand shares in Makarigad Hydropower Company Ltd

Local residents have protested against Makarigad Hydropower Company Limited, which has completed the construction of a 10 MW capacity project in Api Himal Rural Municipality-3, 4, and 5.

The locals have put forth various demands including that shares be given to the citizens of the area affected by the project.

Locals have formed the Makrigad Share Distribution Struggle Committee and also submitted a memorandum to the company, alleging that the local people are unable to directly benefit from the project. This move of the locals comes at a time when the hydropower company is preparing to issue shares.

The memorandum signed by Devendra Singh Rokaya, coordinator of the Struggle Committee, contains the demand that shares should be made freely available to financially weak and poor local citizens and that at least 80 percent of the shares should be ensured for the residents of the project-affected area.

The locals have also demanded the construction of concrete walls and embankments on roads affected by the project. Similarly, the memorandum includes the demand for necessary infrastructure development in the affected areas, the construction of drinking water schemes where water sources dry up, and the construction of new water mills to replace the old displaced traditional water mills. Previously, there were traditional water mills in Makarigad.

Likewise, the company has been requested to provide the necessary equipment for the construction of school buildings and basic health institutions in the project-affected area.

The memorandum submitted to Makarigad Hydropower also contains a warning that if the demands mentioned are not addressed within three days, the hydropower plant will be shut down.

The Struggle Committee, which submitted a memorandum to the hydropower company, has also submitted a memo to Apihimal Rural Municipality, urging necessary coordination regarding share distribution and project matters.

[ 13 January 2026 / nagariknetwork.com ]¡¡¡¡¡¡
 

Electric Folded Treadmill | Kathmandu | Nepal

¡¡SYSTEM
¡¡Backup System
¡¡Solar System
¡¡Wind Power System
¡¡Heating System

¡¡AC & Ventilation
¡¡System

¡¡Cold Room System
¡¡Charging System
¡¡for
¡¡Telecom/Industry
¡¡Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¡¯l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries