energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  NHPC seeks Rs 40 billion viability gap funding for West Seti Hydropower Project

India’s state-owned power utility NHPC Limited has sought Rs 40 billion in Viability Gap Funding (VGF) from Nepal’s Investment Board, citing financial non-viability of the West Seti hydropower project and the mandatory provision of free electricity to Nepal.

NHPC, which was awarded the West Seti and Seti River-6 (SR-6) hydropower projects without a competitive bidding process, has requested the VGF support for the 800-megawatt reservoir-based West Seti project. According to officials, the request has been submitted based on the project’s Detailed Project Report (DPR), which concludes that the project is not financially viable under existing conditions.

VGF is a globally used mechanism through which governments provide financial support to economically important but financially weak infrastructure projects. Nepal’s Public–Private Partnership and Investment Act, 2019, and its regulations allow the government to provide such funding. However, Nepal has not yet implemented any project using VGF despite having a legal framework in place.

Earlier, Budhigandaki Hydropower Company, a government-owned entity, had prepared alternative investment models with and without VGF support, but the proposal did not move forward due to lack of approval from the Ministry of Finance.

Investment Board Nepal has confirmed that NHPC’s VGF request is under review. Chief Executive Officer Sushil Gyawali said no final decision has been made. “NHPC has said around Rs 40 billion is required as VGF. How and whether this will be addressed has not been decided,” he said. Gyawali noted that the project’s reservoir nature and the obligation to provide 21.9 percent free electricity after commercial operation have significantly affected its financial viability.

The 64th meeting of the Investment Board decided to conduct further studies on the DPR of the West Seti project, which carries an estimated investment of Rs 160 billion. A technical team is currently reviewing the proposal. In December 2024, the board approved increasing the project capacity from 750 MW to 800 MW.

The West Seti project was earlier assigned to China Three Gorges International Corporation, but the agreement was terminated after prolonged delays. The project was later showcased during the 2019 Investment Summit and linked with the SR-6 project.

On September 18, 2022, the Investment Board and NHPC signed an agreement in the presence of then Prime Minister Sher Bahadur Deuba, formally assigning NHPC responsibility for developing both projects. Survey licenses were issued in November 2022, with NHPC required to submit DPRs within two years.

While the legal provisions allow VGF support for technically sound but financially weak projects, the government’s decision on NHPC’s request is expected to set a critical precedent for large-scale hydropower financing in Nepal.

[ 16 January 2026 / fiscalnepal.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries