energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  MCC Transmission Line: Construction and Tree Planting Prohibited

The U.S. government has prohibited the construction of any type of structure and the planting of trees within 23 meters to the right and 23 meters to the left of the centerline of the transmission line being built under the Millennium Challenge Corporation (MCC).

The Ministry of Finance published a notice in the Nepal Gazette, banning any kind of construction or tree planting on approximately 1,381 hectares of land that fall on both sides of the transmission line. It is also stated that the Cabinet exercised the authority granted under Subsection (3) of Section 33 of the Electricity Act, 1992.

Subsection (3) states that if the Government of Nepal or a licensed person carries out any construction work related to the generation, transmission, or distribution of electricity, the Government of Nepal may prohibit others from using houses or land located at the construction site or within a specified surrounding distance for certain purposes. The same subsection also provides that the Government of Nepal or the licensed person must pay compensation, as prescribed, for any loss or damage suffered by the concerned individuals due to such prohibition.

“The notice states that, for the purpose of Sub-rule (1) of Rule 66 of the Electricity Regulations, 1993, construction of any type of structure and the planting of trees have been prohibited on approximately 1,381 hectares of land falling within 23 meters to the right and 23 meters to the left of the centerline of the 400 kV electricity transmission line to be constructed by the Millennium Challenge Account Nepal Development Committee (MCA-Nepal). The affected land lies in the districts of Nawalparasi (Bardaghat Susta East), Nawalparasi (Bardaghat Susta West), Palpa, Tanahun, Chitwan, Dhading, Sindhupalchok, Nuwakot, Makwanpur, and Kathmandu, as specified.”

The prohibition applies to land along the transmission line expansion sections including: New Butwal–New Damauli; Nepal–India border–New Butwal; New Damauli–Ratmate Substation; Ratmate–New Hetauda; Ratmate–Lapsiphedi; and Ratmate–New Damauli transmission line sections.

Under the MCC Nepal Compact’s electricity transmission project, contracts have already been signed for the construction of a total of 315 kilometers of electricity transmission lines.

Under the MCC Nepal Compact’s electricity transmission project, the Millennium Challenge Account–Nepal (MCA–Nepal) has signed a construction contract for a 117-kilometer section of the electricity transmission line. The Ashish–Bozler Joint Venture will construct the 117-km transmission line from the under-construction Lapsiphedi Substation in Kathmandu district, via the under-construction Ratmate Substation in Nuwakot district, to the under-construction New Hetauda Substation in Makwanpur district.

The contract, awarded by MCA–Nepal through an international competitive procurement process, is worth approximately USD 76.65 million. Under this agreement, works including the design, installation, testing, and commissioning of the 400 kV transmission line will be carried out.

MCA–Nepal has signed a construction contract for the Ratmate–New Damauli transmission line with the Angelique–Skipper Joint Venture, and a construction contract for the New Damauli–New Butwal transmission line with the Vaiba–Salasar Joint Venture, through an international competitive bidding process. Under these contracts, with a combined cost of USD 154.5 million, works including the design, installation, testing, and commissioning of 180 kilometers of 400 kV transmission lines will be carried out.

MCA–Nepal had also signed a contract worth USD 12.36 million with Transrail Lighting Limited for the construction of an 18-kilometer transmission line within Nepal under the Butwal–Gorakhpur cross-border transmission line project.

Kantipur

[ 30 January 2026 / nepalenergyforum.com ]   
 

Lithium Iron Phoaphate (Lifepo4) Battery - Wall Mounted Energy Storage Lithium Battery - Nepal - Kathmandu

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries