energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Nupche–Likhu Hydropower Project 93.8% Complete, Final Works Underway for COD

The 57.5 MW capacity Nupche-Likhu Hydropower Project under construction in Ramechhap district has been physically completed 93.83%. According to the latest progress report released by the project promoter company, Vision Energy and Power Limited, about 89.90% of the total budget has been spent so far, while overall construction work has reached its final stage.

The company’s report, which covers the progress from approximately October 18, 2025, to January 3, 2026, stated that preparations have been accelerated to bring the project to Commercial Operation Date (COD) within the revised timeline.

The excavation work of the Headrace Tunnel (HRT)—considered the most complex part of the project—has been completed, while the tunnel finishing work is about 69% complete on average. Overall, tunnel shotcreting has been completed over 94%, and the invert lining and rib segment lining are also progressing in stages.

The company stated that the civil structures of both Likhu and Nupche headworks are almost complete. At the Likhu Headworks, progress has exceeded 99%, while work related to the intake, settling basin, floodwall, valve house, and tailrace canal is in its final stage.

Penstock, Anchor Blocks, and Vertical Shaft

Out of 27 anchor blocks along the project’s penstock alignment, 25 have been constructed. Along the Likhu headrace pipe alignment, all 20 anchor blocks have been completed. At Nupche, 8 out of 9 anchor blocks are complete, with one in the final stage, according to the report.

In the vertical shaft, 221 meters of concreting and in the penstock tunnel, 500 meters of concreting have been completed, which is considered a technically significant achievement due to the project’s high head and complex structures.

Electro-Mechanical and Hydro-Mechanical Progress

Electro-Mechanical (EM) work is 92.53% complete. Installation of the turbine, housing, and generator for one of the three units has been finished, while erection work for the remaining units is ongoing. The main transformer assembly and the protection panel in the powerhouse have been installed, the company stated.

Significant progress has also been reported in Hydro-Mechanical (HM) work, which is over 93% complete overall. Penstock pipe erection is 94% complete, while work at Likhu HRP is nearly complete, and at Nupche HRP, over 82% of the work has been finished.

Transmission Line at 89% Progress

The 24-kilometer, 132 kV transmission line connected to the project has reached 89.16% completion. The tower foundations, concreting, and tower erection work are nearly finished. However, stringing work is currently limited to about 34%, which the company plans to accelerate in the coming months.

Challenges and Management

The report also highlights the main challenges faced by the project. These include delays in the delivery of electro-mechanical equipment, difficulties at the site due to winter weather, demands from local authorities, geographical complexities, and the impact of recent political circumstances on the supply chain.

To manage these issues, the company has adopted measures such as local coordination, deployment of equipment and manpower, alternative work schedules, and advance storage of materials.

COD Target by April 2026

According to the latest revised schedule, the project’s Commercial Operation Date (COD) is set for April 13, 2026. The main remaining tasks include completion of all tunnel finishing, installation of the remaining turbine-generator units, full erection of the penstock and vertical shaft, and completion of transmission line stringing.

With a high head of approximately 1,006 meters and an annual generation capacity of around 381 GWh, the completion of the Nupche-Likhu project is expected to significantly add electricity to the national grid.

Jalasarokar

[ 31 January 2026 / nepalenergyforum.com ]   
 

Lithium Iron Phoaphate (Lifepo4) Battery - Wall Mounted Energy Storage Lithium Battery - Nepal - Kathmandu

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries