energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Tanahun Hydropower Project Work Intensifies Across Three Packages

The work on the under-construction 140-megawatt Tanahun Hydropower Project in Tanahun has been accelerated. Construction work under all three packages of the project, which is being built in Rishing Rural Municipality-1, has been intensified.

Project Chief Shyamji Bhandari informed that work is underway on the dam and related structures (headworks) under Package 1, the main tunnel, powerhouse, and associated equipment under Package 2, and the 220 kV Damauli–Bharatpur transmission line under Package 3.

Under Package 1, construction of the dam and related structures is being carried out by the Songda–Kalika JV. Bhandari stated that this package has achieved 47 percent progress. For the construction of the main dam, works such as hill cutting, access roads, a temporary dam required to divert the flow of the Seti River, and the construction of two diversion tunnels have been completed.

For the construction of the main dam, the Seti River was diverted on November 6, 2023 . It has been reported that by May 2024, construction of temporary dams on the upstream and downstream sides of the main dam was completed.

With the completion of these works, the necessary infrastructure to begin concreting and related grouting for the main dam has been prepared, according to Bhandari. “For the construction of the 140-meter-high dam of the project, the first concrete was poured on March 20, 2025, marking the start of concreting work,” he said, adding that concreting, core drilling, grouting, and other related works on the main dam are currently ongoing.

Under Package 2, the construction of the powerhouse and related equipment is being carried out by China’s Sinohydro Corporation. Bhandari said that excavation work for underground structures has been completed so far, and most of the civil construction of these structures has also been finished. The main concreting works of structures such as the powerhouse, cable tunnel, surge tank, and tailrace have been completed, and progress under this package has reached 72.5 percent.

According to Bhandari, the civil works of the powerhouse are nearly complete, while electromechanical works are ongoing. Roofing of the powerhouse, water discharge arrangements, and other related works are currently underway.

Under Package 3 of the transmission line, India’s KEC International Limited has completed foundation works for 78 out of the 94 towers along the 33-kilometer-long 220 kV Damauli–Bharatpur transmission line. Progress under this package has reached 74.5 percent. In addition, Bhandari said that necessary coordination is underway with the Ministry of Energy, Water Resources and Irrigation and the Ministry of Finance to obtain permission for the use of forest land and the removal of trees and vegetation in those areas.

Under Package 3 of the transmission line, India’s KEC International Limited has completed the foundation work for 78 out of 94 towers along the 33-kilometer 220 kV Damauli–Bharatpur transmission line. Progress of this package has reached 74.5 percent. In addition, Bhandari stated that necessary steps are being taken with the Ministry of Energy, Water Resources and Irrigation and the Ministry of Finance to obtain permission for the use of forest land and the removal of trees and vegetation in the area.

The company’s capital structure and financial management for the total project cost (including the transmission line, rural electrification, and construction-period interest) of USD 50.5 million have been arranged as follows: the Asian Development Bank (ADB) will provide USD 15 million, the Japan International Cooperation Agency (JICA) USD 18.4 million, the European Investment Bank USD 8.5 million, and the Government of Nepal/Nepal Electricity Authority USD 8.6 million.

[ 31 January 2026 / nepalenergyforum.com ]   
 

Lithium Iron Phoaphate (Lifepo4) Battery - Wall Mounted Energy Storage Lithium Battery - Nepal - Kathmandu

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries