energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Mewa Khola prepares for trial generation after completing internal testing

An under-construction building of the Mewa Khola Hydro Electricity Power plant at Lafyang in Diktel Municipality of Khotang district, on Tuesday, September 13, 2016. Photo: RSS

The 50-megawatt Mewa Khola Hydropower Project, completed on the Mewa Khola in Taplejung, has finished its internal testing and is now preparing for trial power generation.

United Mewa Khola Hydropower Company had applied for the trial about two months ago. It has been reported that forming the committee will take at least another week. Once the technical team begins trial generation, the Nepal Electricity Authority will take the electricity free of charge for 15 days during testing. If no issues are observed during this phase, the project is expected to enter commercial operation within four weeks.

The project, which began construction in December 2021/2022, was completed on schedule. The five-kilometer-long tunnel, dam, powerhouse, and transmission line have all been constructed. The company has also built a seven-kilometer transmission line from the powerhouse to the Dhungesanghu substation with its own investment. However, despite all the physical structures being ready, the project has reached a “ready but non-operational” state because the Nepal Electricity Authority’s COD (Commercial Operation Date) process has not progressed.

Once operational, the project is expected to generate more than 303 gigawatt-hours of electricity annually. Connected to the national transmission system through the Kosi Corridor, this project is considered important for balancing supply in eastern Nepal during the winter season.

The estimated cost of the project is around NRs 900 crore, with 75% financed through loans. Since the loan investment comes from a consortium of eight banks, the delay in production has increased pressure on interest payments.

The Mewa Khola project is one of the “Super Six” projects that the government allowed the private sector to construct through a competitive process.

Company to issue shares worth NRs 1.3 billion

The company has initiated the process of issuing shares worth NRs 1.3 billion for the local communities affected by the project and the general public. For this, the company has already received approval from the Electricity Regulatory Commission. The company has called the second and third annual general meetings (AGMs) with the main proposal for the IPO issuance.

The meetings are scheduled for 11 AM on February 23 at the company’s registered office in Kathmandu. During the meetings, special proposals will be passed, including: issuing the company’s IPO to the general public, authorizing the board of directors to make related decisions, amending the company’s articles of association and bylaws, and empowering the board to implement any amendments as directed by the regulatory authority.

Urjasanchar

[ 2 February 2026 / nepalenergyforum.com ]   
 

Lithium Iron Phoaphate (Lifepo4) Battery - Wall Mounted Energy Storage Lithium Battery - Nepal - Kathmandu

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries