energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Compensation Fixed for Households Affected by Tanahun Hydropower Project

Compensation has been determined for 10 households affected by the under-construction 140-megawatt Tanahun Hydropower Project in Jhaputar, Rishing Rural Municipality-1.

According to the project, a recent meeting of the Compensation Determination Committee, chaired by the Chief District Officer, fixed compensation based on damages incurred during project construction in the Lokpa, Dharapani, Dhoklak, Bulsat, and Jhaputar areas.

Similarly, based on the committee’s on-site inspection report, compensation has been determined for damage to orange trees affected during the construction of a tower retaining wall under the Damauli–Bharatpur transmission line in Sodhe, Byas Municipality-14.

The Compensation Determination Committee meeting was convened to address compensation demands raised by users of public (ailani) land and informal settlers located within the reservoir and buffer zone areas. The meeting discussed the additional responsibility assigned to the Compensation Determination Committee by a Cabinet decision to conduct on-site studies and surveys of ailani land that has long been under cultivation, use, and settlement within the demarcated reservoir and buffer zone of the project.

Under Package-1 of the project, works related to the dam and associated structures (headworks) are underway; under Package-2, construction of the main tunnel, powerhouse, and related equipment is in progress; and under Package-3, work is ongoing on the 220 kV Damauli–Bharatpur transmission line.

Regarding the company’s capital structure and financial management, financing has been arranged for the project’s total cost of USD 505 million (including the transmission line, rural electrification, and interest during construction). Of this amount, the Asian Development Bank (ADB) will provide USD 150 million, the Japan International Cooperation Agency (JICA) USD 184 million, the European Investment Bank USD 85 million, and the Government of Nepal/Nepal Electricity Authority USD 86 million.

[ 3 February 2026 / nepalenergyforum.com ]   
 

Lithium Iron Phoaphate (Lifepo4) Battery - Wall Mounted Energy Storage Lithium Battery - Nepal - Kathmandu

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries