energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Sabha Khola ‘B’ Hydropower Project Completes 4,110-Meter Main Tunnel

The construction of the main tunnel of the 21.5-megawatt Sabha Khola “B” Hydropower Project, being built in Sabhapokhari Rural Municipality of Sankhuwasabha, has been completed. Under the project, the 4,110-meter-long tunnel was successfully “broken through” on Monday.

The formal inauguration of the tunnel breakthrough was carried out by Ganesh Karki, Managing Director of Orbit Energy Limited. This project, being advanced with private sector investment, has its intake located in Sabhapokhari Rural Municipality–3, while the project structures are spread across Wards No. 3, 4, and 5.

According to information provided by Project In-charge Krishna Prasad Pant, construction of the main tunnel from the intake to the penstock pipe installation point has been completed. Next, concrete lining will be carried out inside the tunnel, after which water will be conveyed to the powerhouse through a 1,045-meter-long penstock pipe.

So far, the project has achieved around 75 percent physical progress. Construction of the project began on November 9, 2022, and the target is to complete it by May 6, 2023.

Electricity generated by the project will be connected to the national grid through the Nepal Electricity Authority’s substation under construction at Sittalpati, Khandbari Municipality–10. The project has stated that about 60 percent of the required transmission line construction has already been completed.

The project, which involves an investment of around five billion rupees, has Vaibhav Power Nepal Pvt. Ltd. as its main construction company. Alongside the project, social development programs such as employment generation, education, health services, drinking water, road construction, and the building of Bailey bridge crossings have also been implemented in the affected areas.

Urjasanchar

[ 4 February 2026 / nepalenergyforum.com ]   
 

Lithium Iron Phoaphate (Lifepo4) Battery - Wall Mounted Energy Storage Lithium Battery - Nepal - Kathmandu

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries