energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Locals mount pressure to push ahead Budhigandaki hydropower project

Local stakeholders have stepped up pressure on the government to move forward the reservoir-based Budhigandaki Hydropower Project, a national pride project that has remained stalled for years.

The Dhading Chamber of Commerce and Industry has launched a signature campaign to push for the implementation of the project by setting up a dedicated stall at the 10th Dhading Festival, which began on January 29 in Dhading Besi, the district headquarters. The festival will continue until February 8.

The campaign aims to draw the attention of the state and build public pressure for the long-delayed project. Federation of Nepalese Chambers of Commerce and Industry (FNCCI) President Chandra Prasad Dhakal inaugurated the campaign by signing the petition while attending the festival’s opening ceremony.

Dhading Chamber President Ram Kumar Dallakoti expressed concern over delays in the project that he said would significantly impact not only Dhading and Gorkha districts but the national economy as a whole. “Budhigandaki is Nepal’s largest reservoir-based, multipurpose hydropower project. It must be advanced without further delay,” he said, adding that the signature campaign was launched precisely to intensify pressure on the government.

Dallakoti said completion of the project would promote employment and various businesses, stressing that the project should no longer be left in uncertainty. He also noted that local residents along key northern trade routes of Dhading and Gorkha have been displaced for years in anticipation of the project as construction is yet to begin.

Local resident Navaraj Timilsena said the dream of seeing the project materialize has yet to be realized. “People agreed to leave their ancestral land believing this national pride project would be built. The initiative taken by the Dhading Chamber to apply pressure is commendable,” he said.

The Budhigandaki Hydropower Project, with a planned capacity of 1,200 megawatts, was deemed feasible at an estimated cost of Rs 331 billion. Key preparatory works, including compensation distribution, have largely been completed. More than Rs 45 billion has already been disbursed as compensation in affected areas.

Around 50,000 residents from 23 former Village Development Committees in Dhading and Gorkha districts had agreed to relocate, expecting the project to bring transformative economic change. However, frustration has grown as construction remains stalled. “We were ready to leave our homes for a national pride project, but the prolonged delay has deeply disappointed us,” said local resident Raj Kumar Shrestha.

While uncertainty persists, the Cabinet on January 16 approved the investment modality of the Budhigandaki project. Despite being listed as a national pride project in 2011, nearly 14 years were spent primarily on land acquisition and compensation.

Following approval of the modality, the base construction cost is estimated at approximately USD 2.77 billion (Rs 374 billion). Including interest during construction, the total cost is projected to reach nearly Rs 400 billion. The project, with an eight-year construction timeline, will be developed under a public–private partnership (PPP) model.

Under the shareholding structure, the Ministry of Energy, Water Resources and Irrigation will hold 50 percent ownership, the Ministry of Finance 30 percent, and the Nepal Electricity Authority 20 percent. While shares will later be allocated to affected locals and the general public, government ownership will not fall below 51 percent.

Once completed, the project is expected to generate an average of 3,383 gigawatt-hours of electricity annually.

Meanwhile, a board meeting of the Press Council Nepal, held in Salantar, Dhading, on Saturday, also urged the government and concerned agencies to expedite the project. In a statement issued on Tuesday, the Council expressed solidarity with the signature campaign launched by the Dhading Chamber of Commerce and Industry.

[ 6 February 2026 / nagariknetwork.com ]   
 

Lithium Iron Phoaphate (Lifepo4) Battery - Wall Mounted Energy Storage Lithium Battery - Nepal - Kathmandu

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries