energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Government Approves Differentiated PPA Rates for Reservoir-Based Hydropower Projects

The government has introduced differentiated power purchase agreement (PPA) rates for reservoir-based hydropower projects and decided that PPA rates for projects above 100 MW will be determined based on their total costs.

Issuing the ‘Directive on Electricity Purchase and Sale of Reservoir-Based Power Plants 2026,’ the Electricity Regulatory Commission (ERC) has unveiled new provisions for large reservoir-based projects with high costs, aiming to enhance their financial viability. The ERC has been authorised to determine PPA rates, while the Nepal Electricity Authority (NEA) will apply the rates approved by the commission.

Until now, the NEA had been fixing a uniform rate for all reservoir-based projects, set at Rs 12.40 per unit in winter and Rs 7.10 per unit during the monsoon. Under the new arrangement, PPAs for projects up to 100 MW will be capped at a maximum of Rs 14.80 per unit in winter and Rs 8.45 per unit in the rainy season. For projects above 100 MW, the PPA rate will be determined based on the actual project costs.

ERC Chairperson Ram Prasad Dhital said the differentiated policy aims to attract investment in reservoir projects with relatively higher costs. “In recent days, investment—particularly in large projects—has slowed due to rising construction costs, higher interest rates on loans, and foreign exchange risks, among other factors,” Dhital said.

As per the directive, projects will be allowed to factor in loan interest rates, operation and maintenance costs, foreign exchange risks, depreciation, interest on working capital, royalties, income tax, and hedging costs when calculating total project costs. For this purpose, equity valuation has been capped at 30 percent.

The directive divides the PPA process into three phases. The first phase will be completed after finalising the Detailed Project Report (DPR), providing a basis for securing loans by ensuring electricity purchase commitments. In the second phase, rates will be updated based on the actual contract cost after the construction agreement is signed.

The third phase will be reviewed within one year of project completion and the commencement of electricity generation. As a result, the initial PPA rate may differ by the time it reaches the final phase.

However, a maximum limit of 25 percent has been set on the increase in capital costs that can be considered in calculating the PPA rate. Additionally, there is a provision to review the rate every five years.

Under the directive, electricity purchasers must submit a technical and financial analysis to the ERC within 180 days of receiving a proposal. The commission will conduct due diligence, issue a public notice, and hold a public hearing before determining the rate. The final PPA rate will then be concluded between the buyer and the project developer based on the rate approved by the ERC.

Republica

[ 15 February 2026 / nepalenergyforum.com ]   
 

Lithium Iron Phoaphate (Lifepo4) Battery - Wall Mounted Energy Storage Lithium Battery - Nepal - Kathmandu

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries