energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  132 kV Power Line from Tamghas – Burtibang Starts Testing Phase

Testing has begun today on the 132 kV double-circuit transmission line constructed by the Nepal Electricity Authority from Tamghas, the district headquarters of Gulmi, to Burtibang. Built under the Burtibang–Paudi Amarai–Tamghas–Sandhikharka–Gorusinge 132 kV transmission line project, the line has been extended through various local levels of Gulmi and Baglung districts.

According to the Authority, testing and power transmission of electricity with a capacity of 132,000 volts will be carried out on the transmission line running from the Tamghas Substation at Unaichaur in Ward No. 7 of Resunga Municipality, Gulmi, to the Burtibang Substation at Khaltubot in Ward No. 2 of Dhorpatan Municipality, Baglung.

Project Chief Manoj Chaudhary of the Electricity Authority informed that preparations have been made to bring the transmission line into regular operation only after conducting tests for two days starting today. He stated that the line has been extended through Resunga Municipality Wards 3, 4, and 5; Isma Rural Municipality Ward 2; and Musikot Municipality Wards 1, 2, and 3 in Gulmi, and through Badigad Rural Municipality Wards 2, 5, 6, and 7 and up to Burtibang in Dhorpatan Municipality Ward 2 of Baglung.

Taking into account the potential risks associated with high voltage, the Authority has urged the general public not to climb transmission line towers, not to touch the wires or structures, not to go near the towers, and not to leave domestic animals unattended outside. People have been requested to stay away from structures marked with danger signs and to make children aware of the risks. The Authority has also requested that if sparks are seen during testing or if any other danger is felt, the matter should be reported to the nearest police post or the Authority’s office.

According to the Authority, Project Chief Chaudhary stated that the construction of this project has been completed at a cost of more than NPR 4.5 billion. He expressed hope that once the project comes into operation, electricity supply in Gulmi and Baglung districts will become more reliable and stronger.

Project Chief Chaudhary stated that arrangements have been made for electricity to flow from the Motipur Substation in Kapilvastu, through Arghakhanchi, passing via Unaichaur in Gulmi and Paudi Amarai in Musikot, to Burtibang. Previously, when electricity was supplied from the substation in Butwal over long distances, service disruptions occurred repeatedly. With the operation of the new transmission line and substation, these problems are expected to be resolved, ensuring smooth and long-term electricity service in the district.

Biznessnews

[ 15 February 2026 / nepalenergyforum.com ]   
 

Lithium Iron Phoaphate (Lifepo4) Battery - Wall Mounted Energy Storage Lithium Battery - Nepal - Kathmandu

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries