energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Upper Trishuli-1 Hydropower Project Sees Cost Hike of NPR 30 Billion

The cost of the Upper Trishuli-1 Hydropower Project is expected to increase. The projected cost of the 216-megawatt project is estimated to rise by approximately NPR 30 billion.

The project’s cost is estimated to increase from NPR 36.48 billion 37 million 92 thousand to NPR 66.12 billion 25 million. Back in 2013, the Environmental Impact Assessment (EIA) report had been approved with a cost estimate of NPR 36.48 billion.

However, the project has not been able to move forward. After 12 years, a supplementary Environmental Impact Assessment (EIA) report has been made public. The supplementary EIA estimates that the project’s cost has increased abnormally, reaching more than NPR 66 billion.

The proponent of the Upper Trishuli-1 Hydropower Project is Nepal Water and Energy Development Company Pvt. Ltd.

It has been clarified that a supplementary Environmental Impact Assessment (EIA) was conducted due to changes made to the project’s design, cancellation of the access road up to the dam site, construction of three additional Bailey bridges, minor modifications to project structures, and the designation of project activities within the buffer zone of Langtang National Park.

The project is based on a run-of-the-river scheme. The proposed project has a design discharge of 76 cubic meters per second and aims to generate a total of 216 megawatts of electricity. The headworks of the project are located on the lower bank, 275 meters downstream from the confluence of the Trishuli River and the Bhotekoshi River, while the powerhouse is situated on the upper bank, 500 meters upstream from the confluence of the Mailung Khola and the Trishuli River.

The hydropower project has a gross head of 342.6 meters. The energy generated by the project will be transmitted from the project’s switchyard to the Chilime–Trishuli-3B Hub Station through a 220 kV single-circuit transmission line.

The project’s main structures include a diversion tunnel, intake, desander, headrace tunnel, surge shaft, penstock, powerhouse, tailrace, and switchyard. All major project structures are located on the right bank of the Trishuli River, while temporary structures at the camp and headworks fall within the buffer zone of Langtang National Park.

To reach the proposed project’s headworks area, there is a 23-kilometer road from Betrawati along the Galchhi–Betrawati–Mailung–Syafrubesi–Kerung National Highway, while access to the powerhouse area involves a 13-kilometer unpaved road from Betrawati.

Biznessnews

[ 16 February 2026 / nepalenergyforum.com ]   
 

Lithium Iron Phoaphate (Lifepo4) Battery - Wall Mounted Energy Storage Lithium Battery - Nepal - Kathmandu

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries