energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Malkwang Gets Reliable Electricity Through Central Transmission Line

In Dhawalagiri Rural Municipality–5, Malkwang of Myagdi, electricity has now reached every household through the central transmission line. Under the Nepal Electricity Authority’s “Ujyalo Myagdi” program, the transmission line has been extended from Dhawalagiri–6, Marang, to Malkwang.

According to Amar Chhantyal, the chairperson of Ward 5, “By installing poles for the main and branch lines, stringing the wires, and setting up a 100 kVA transformer, electricity has been supplied to local households. In the initial phase, 43 houses, the ward office, health post, and schools have been connected with a total of 46 meters.”

Previously, locals relied on electricity from the Nandibang River small hydropower project. However, with the extension of the central transmission line, stable and reliable electricity is expected to bring qualitative improvements in local administration, education, and health services. Chairperson Chhantyal also mentioned that the authority has committed to extending the line to the Hopakhola area in the next phase.

The Nepal Electricity Authority has been implementing a plan since 2021–2024 to extend the national transmission line to about 2,183 households in 14 locations of Myagdi, with a budget of NPR 220 million. Under this plan, many settlements in Malika, Dhawalagiri, and Bul rural municipalities have already been electrified, and transformers have been installed in 370 households in Lulang.

From an analytical perspective, the electrification of Malkwang is expected to bring significant improvements in education, health, information technology, and local businesses. With electricity access, local production, shop operations, and emergency services are anticipated to become easier. However, for sustainable use, regular maintenance of transformers and lines, theft prevention, and energy-saving measures are also necessary at the local level.

According to the authority’s plan, the extended central transmission line aims to provide stable and reliable electricity access to all settlements of Dhawalagiri Rural Municipality in the future, which is expected to advance the municipality’s overall economic and social development.

Jalasarokar

[ 30 March 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries