energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Reservoir-Based Hydropower Gets 50-Year License; Developers Demand Same for All Projects

The government has decided to extend the generation license period for reservoir-based hydropower projects to 50 years.

The Ministry of Energy, Water Resources and Irrigation has made this decision, increasing the license period from 45 years to 50 years for such projects.

Considering the long study and preparation period, high costs, and returns associated with reservoir-based projects, the government has decided to fix the license duration at 50 years.

Energy Minister Biraj Bhakta Shrestha has directed the Department of Electricity Development to complete the process within 45 days. The decision aims to strengthen energy security and attract greater private sector participation in reservoir-based projects.

The decision has been taken by the government led by Rastriya Swatantra Party (RSP). In its election manifesto, the party had committed to extending the license period of all types of projects to 50 years. The Electricity Act, 1992 also states that projects with more than 50 percent Nepali investment can have a license period of up to 50 years, with provisions for renewal before expiry. Based on this, RSP had pledged to standardize the generation license period at 50 years.

The private sector has welcomed the decision and urged the government to implement its manifesto commitments.

President of the Independent Power Producers’ Association, Nepal (IPPAN), Ganesh Karki, has called for extending the license period to 50 years for all types of projects, as mentioned in the party’s manifesto. He emphasized that clean energy is essential for building a prosperous Nepal and urged the government to promote private sector participation. He added that increasing the license period would differentiate the current leadership from previous governments, which often made commitments without delivering. He also urged RSP not to forget its commitments.

Currently, the generation license period is 35 years for domestic investment and 30 years for foreign investment. The Department of Electricity Development has been issuing licenses with a 35-year duration to domestic developers for run-of-river and semi-reservoir projects.

IPPAN Treasurer Narendra Ballabh Panta also stressed that the government should not forget its manifesto. He said implementing these commitments presents an opportunity to achieve prosperity through energy development. He added that if the government facilitates the private sector, which is capable, it could open the door to broader development.

Nepalpurbadhar

[ 18 April 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries