energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Sikta Project covers only 24,000 hectares of lands

Photo: TRN Sikta Irrigation Project, a national pride project under construction in Banke.

The construction of the Sikta Irrigation Project, a national pride project under construction in Banke, has achieved irrigation coverage over 24,000 hectares of land despite taking nearly two decades and spending close to Rs. 24 billion.

According to the project director, Raju Acharya, the total expenditure since the project’s inception has reached Rs. 23.77 billion. With this investment, irrigation facilities from this project have been provided to 24,766 hectares of land in the district so far.

He said that the project, which was operated by constructing a dam on the Rapti River at Agaiya in Rapti Sonari Rural Municipality–2 of Banke, aims to provide irrigation to 42,766 hectares of land. As of the mid-April of the current fiscal year 2025/26, irrigation facilities have been directly provided only to 24,766 hectares of land.

According to the project’s Information Officer and Senior Divisional Engineer, Manoj Kumar Sah, construction is currently underway with a revised master plan estimating a total cost of Rs. 52.64 billion, with completion targeted for the fiscal year 2032/33. Although two decades have passed since the project began, only 46 per cent physical progress has been achieved so far.

He said that it has become easier for farmers to cultivate their crops with irrigation facilities reaching over 24,000 hectares, which are dependent only on rainwater. One of the reasons for the delay in the construction of the project is the failure to receive the sufficient budget, he said.

For the current fiscal year, a budget of Rs. 3.30 billion was proposed as per the approved master plan, but less than half - only Rs. 1.57 billion - was received, according to Acharya. He added that by mid-April, 2026 of current fiscal year, Rs. 857.79 million had been spent.

During the review period of the current fiscal year, the project has achieved 76.31 per cent physical progress and 54.48 per cent financial progress. Local farmers and civil society leaders have stressed the need for adequate and timely budget allocation, along with the removal of other obstacles, to accelerate construction.

Krishna Prasad Shrestha, coordinator of the Citizens Concern Forum Banke, emphasised that timely funding and support are essential for completing national projects like Sikta Irrigation on schedule.

According to the project, water distribution is managed through two main canals - western and eastern canals - with irrigation provided via branch canals.

By Siraj Khan

[ 21 April 2026 / risingnepaldaily.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries