energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Rahughat Hydropower Nears Completion, Test Generation Set to Begin Soon

The 40 MW Rahughat Hydropower Project, promoted by Raghuganga Hydropower - a subsidiary of the Nepal Electricity Authority - has achieved 95 percent physical progress and is now in the final stage of preparation for test generation.

According to Managing Director Ganesh KC, construction of major structures, including the tunnel, dam, and powerhouse, has been completed, while installation of equipment is also nearing completion. He said finishing works are currently underway, and preparations for structural testing are in progress with a target to begin test production by mid-June.

“We are preparing to conduct testing by sealing four inlets and filling the tunnel with water,” KC said.

The dam has been constructed in Raghuganga Rural Municipality-4, Dagnam, and Ward No. 5, Jhinko Phedi. Meanwhile, the main tunnel, approximately 6.27 kilometers long, along with two settling ponds, has already been completed. At the Tilkenichaur-based powerhouse, one 20 MW unit has already been installed, while installation of the second unit is in its final stage.

A switchyard has also been constructed to connect the generated electricity to the national transmission system. Power produced from Rahughat will be integrated into the national grid via the 220 kV Dana-Kushma transmission line under the Kaligandaki Corridor.

Construction of the project began on November 17, 2017, after awarding the contract to India’s JP Group. Although the initial target was to complete the project within 45 months, repeated deadline extensions were required due to the COVID-19 pandemic, floods and landslides, and shortages of construction materials.

Similarly, a contract was signed with Bharat Heavy Electricals Limited (BHEL) for the installation of electromechanical equipment. The project is being financed through a concessional loan from the Export-Import (EXIM) Bank of India, along with joint investment from the Government of Nepal and the Nepal Electricity Authority.

The Rahughat project aims to generate approximately 240 million units of electricity annually. With transmission infrastructure also nearing completion, electricity generation is expected to begin within the next few months.

Jalasarokar

[ 21 April 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries