energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Babai Irrigation Project cost nearly doubles

The long-awaited Babai Irrigation Project in Bardiya has seen its cost nearly double due to time overrun.

Initially estimated at Rs. 16.43 billion, the project is now expected to cost around Rs. 33.19 billion.

The project, whose study began in 1967, has yet to be fully completed by 2025. The cost has continued to rise due to construction delays, design changes, flood-related damage, and challenges in financial management.

The project aims to provide irrigation facilities to around 36,000 hectares of land and is expected to boost agricultural production in Bardiya district. Earlier studies had identified approximately 40,000 hectares as irrigable, but subsequent assessments reduced the area to 36,000 hectares.

Under the first phase, a dam was constructed in 1992 for Rs. 679.5 million. Following this, a 5.5-km main canal was built, extending irrigation services to around 4,000 hectares of land.

In the second phase, construction of siphons, link canals, and other infrastructure began. However, flood damage in 2014 necessitated reconstruction, further delaying the project and increasing costs.

According to the approved master plan (2018), the project is now targeted for completion within the fiscal year 2025/26. Project Director Gopal Sharma said that more than Rs. 12.28 billion has already been spent.

He added that the project requires the construction of 91 km of main canals - 34 km on the eastern side and 41 km on the western side - along with additional sections. Furthermore, 313 km of branch, sub-branch, and tertiary canals, as well as various structures, drainage systems, and service roads, remain to be completed.

The related Bheri–Babai Diversion Multipurpose Project aims to divert water from the Bheri River into the Babai River to irrigate 51,000 hectares of land in Bardiya and Banke districts, while also generating 48 megawatts of electricity.

However, delays in completing such national pride projects have led to repeated cost escalations. Similar issues have been observed in other major projects, including the Rani Jamara–Kulariya Irrigation Project, the Sunkoshi–Marin Diversion Project, and the Mahakali Irrigation Project.

Stakeholders note that delays not only postpone returns on state investment but also undermine the effective utilisation of taxpayers’ money.

[ 22 April 2026 / risingnepaldaily.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries