energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Lower Seti Hydropower Project: Tunnel Construction Begins on 126 MW Cascade Scheme

Construction of the access tunnel for the 126 MW Lower Seti Hydropower Project has begun. The project, fully owned by the Nepal Electricity Authority, is being developed at Devghat Rural Municipality-4 in Tanahun district.

Project promoter Tanahun Hydropower Limited has signed a contract with Kathmandu-based R.K. Hydro Engineering and Associates Pvt. Ltd. for tunnel construction. Although the agreement was signed on February 19, 2024, construction could not proceed earlier due to delays in obtaining approval for the use of explosives. Project Chief Hari Kumar Shrestha said the tunnel work has now started after receiving the necessary permits.

According to him, the access tunnel is an important initial structure of the project and will support the construction of major structures, geological studies, and access management.

The Lower Seti Project is a semi-reservoir type peaking run-of-river hydropower project. It aims to generate 520.78 million units of electricity annually.

Under the project, a 32-meter-high dam will be constructed on the Seti River near Saranghat in Bandipur Rural Municipality of Tanahun. The dam will create a reservoir stretching around 12.7 kilometers. Stored water will be diverted through a 6.75-kilometer tunnel to a semi-underground powerhouse to be built at Gaighat in Devghat Rural Municipality-4.

The project’s detailed project report was prepared with grant assistance from the Asian Development Bank. The estimated cost of the project is USD 227 million. According to the project, a conceptual decision has already been made to manage financing through 30 percent equity and 70 percent loans.

The process of acquiring around 146 ropani of land required for the construction of the powerhouse and staff quarters has also been initiated.

Once operational, the project is expected to generate electricity at full capacity for at least six hours daily during the dry season. Since it will utilize water released from the under-construction Tanahun Hydropower Project upstream, the Lower Seti Project is considered an important cascade project.

The project is also expected to use the same transmission line as the Tanahun Hydropower Project, eliminating the need for additional transmission infrastructure. Furthermore, being located near major electricity consumption centers such as Kathmandu and Bharatpur, the project is expected to be cost-effective and commercially viable.

The project stated that the grid connection agreement has already been completed, while the power purchase agreement process is moving forward. A concrete bridge over the Trishuli River is required for access to the powerhouse area, with an estimated cost of around NPR 370 million.

The project’s Environmental Impact Assessment report has already been submitted to the Ministry of Forests with the required fee for final approval. The project also stated that initiatives are underway for financial support from the Japan International Cooperation Agency, while the Asian Development Bank has included the project in its 2027 implementation pipeline.

Jalasarokar

[ 13 May 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries