energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Govt Announces Contracting Process for 828 MW Uttarganga Project Next Year

The government is set to move four major hydropower projects, including the much-awaited 828-megawatt Uttarganga Reservoir Hydropower Project, into the contracting process within the upcoming fiscal year.

Presenting the budget for fiscal year 2026/27 in the Federal Parliament on Friday, Finance Minister Dr. Swarnim Wagle announced that Rs 85.54 billion has been allocated for electricity generation, transmission, and distribution systems, with priority given to expanding the energy sector.

According to the budget, the contracting process will begin after financial arrangements are completed for the 828-megawatt Uttarganga Reservoir Hydropower Project, the 1,061-megawatt Upper Arun Hydropower Project, the 210-megawatt Chainpur Seti Hydropower Project, and the 77-megawatt Ghunsakhola Hydropower Project.

Similarly, the government stated that studies for the 417-megawatt Nalgad Hydropower Project, the 490-megawatt Arun-4 Hydropower Project, and the 281-megawatt Naumure Hydropower Project will be advanced. The budget also mentions that the contracting process for the 439-megawatt Betan Karnali Hydropower Project, which is being developed with investment from Employees Provident Fund depositors, will begin next year.

Uttarganga project in focus for two decades

The Uttarganga Reservoir Hydropower Project, proposed in the Dhorpatan area of Baglung, has remained under discussion since 2004. The project is being developed by Uttarganga Hydropower Company Limited, a subsidiary of the Nepal Electricity Authority.

The project’s Environmental Impact Assessment (EIA) report was approved in 2080 BS. Considered one of Nepal’s most cost-effective reservoir projects in terms of per-megawatt cost, the project is now being prepared for the construction phase following budget allocation and financial management efforts.

Federal MP from Baglung Constituency No. 2, Shome Sharma, said clear provisions have been included in the budget to move the project into the contracting phase. According to him, the long-awaited project is now expected to enter a new stage of implementation.

Target to begin power generation within 10 years

According to the feasibility study, a dam approximately 200 meters high will be constructed on the Uttarganga River in Dhorpatan to store water. The stored water will then be diverted to Nisikhola through a tunnel for year-round electricity generation.

The project includes the construction of an 8,510-meter headrace tunnel and a 1,875-meter penstock pipe. In addition, two underground powerhouses will be built. Four units with a capacity of 105 megawatts each will be installed in the first powerhouse, while four units with a capacity of 101 megawatts each will be installed in the second powerhouse.

The project aims to begin electricity generation within 10 years from the start of construction and is expected to make a significant contribution to the country’s energy security.

Jalasarokar

[ 31 May 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries