energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Dudhpokhari Chepe Project Nears Early Completion, Power Production Ahead of Timeline

The 11 MW Dudhpokhari Chepe Hydropower Project, being constructed on the border of Gorkha and Lamjung districts, has reached its final stage. With the start of wet testing of hydro-mechanical and civil structures, the project is moving closer to commercial electricity generation.

According to the project developer, Dudhpokhari Chepe Hydropower Company, water is currently being flowed through the main structures to test the intake, desander (sediment settling basin), penstock pipe, and surge tank. The company stated that this testing ensures safe operation of the structures, leakage control, and performance efficiency as per design standards.

Project engineer Pratik Acharya said that all civil and hydro-mechanical works have already been completed, while electro-mechanical installation work is now progressing at a fast pace. “We aim to complete the electro-mechanical works within Asar and begin electricity generation,” Acharya said.

Although the project’s electricity generation schedule under the Power Purchase Agreement (PPA) extends until Oct/Nov, the company has advanced the timeline and is working to connect electricity to the national grid about four months ahead of schedule.

Located in the Ajirkot Rural Municipality of Gorkha and Dudhpokhari Rural Municipality of Lamjung in Gandaki Province, the project is a run-of-river (RoR) scheme based on the Chepe River. It will generate 11 MW of electricity using a design discharge of 1.5 cubic meters per second and a net head of approximately 847 meters.

The project is expected to generate around 69.34 GWh of energy annually from two Pelton turbines, including 45.44 GWh during the wet season and 23.90 GWh during the dry season.

The generated electricity will be transmitted via a 33 kV transmission line to the Nepal Electricity Authority’s Kirtipur substation, located about 22 kilometers away.

According to the company, most construction and equipment installation works have already been completed, and the transmission line construction is also in its final phase. After completion of wet testing, turbine and generator tests will be conducted before connecting the project to the national transmission system.

Originally initiated at a capacity of 8.836 MW, the project was later upgraded through a design revision to 11 MW. Once operational, it is expected to contribute additional clean domestic energy to the national power system.

Urjasanchar

[ 7 Jun 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries