energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Upper Kabeli Hydro Completes Tunnel Construction

The tunnel construction work of the under-construction Upper Kabeli Hydropower Project in Taplejung has been completed.

The tunnel, built for the hydropower project that aims to generate electricity from the Kabeli River flowing along the border of Sirijangha and Sidingwa rural municipalities, has now been fully completed.

According to project manager Prakash Dhungana, the tunnel construction work was completed by Sunday. Dhungana informed that with the completion of the project’s main tunnel, all tunnel construction work for the 28.1 MW hydropower project has now been finalised.

Dhungana informed that the construction of a total of 5,600 metres of tunnels, including the main and adit tunnels, has been completed.

Of this, the approximately 4,800-metre-long main tunnel construction was completed on Sunday. Earlier, in the first week of last August, the construction of the adit tunnel connecting the intake had been completed.

With the completion of tunnel construction, around 75 per cent of the project’s overall construction work has now been finished, according to Dhungana. He said that, alongside the main tunnel, the installation of pipes, transmission line wiring, and construction of structures including the penstock tunnel and intake, have already been completed.

Dhungana said that only a few structures, including the sand-settling pond, which has already achieved around 50 per cent progress, remain to be completed.

He added that work is currently being accelerated to test electricity generation from the project by Dashain and Tihar period in October-November.

The project’s headworks are located at Tellok Puchhar in Ward No. 4 of Sirijangha Rural Municipality, while the powerhouse is situated at the confluence of the Nebu River on the border of Wards 1 and 2.

The project is being promoted by Peace Energy Company Limited, with a total estimated cost of Rs. 5.64 billion. Of the total investment, 75 per cent consists of loans from Nepali banks, while the remaining 25 per cent has been invested by the promoter company.

Electricity generated from the Upper Kabeli Project will be integrated into the national transmission grid through the Nepal Electricity Authority’s 132 kV substation located in Amarpur of Hilihang Rural Municipality, Panchthar.

Meanwhile, the project’s main affected areas include Sinam in Ward No. 1, Ambegudin in Ward No. 2, and Tellok in Ward No. 4 of Sirijangha Rural Municipality, as well as Limbudin in Ward No. 5 and Mehele in Ward No. 6 of Sidingwa Rural Municipality.

Rising Nepal

[ 9 Jun 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries