energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Government Opens PPAs for Hydropower Projects Below 10 MW

The government has decided to open Power Purchase Agreements (PPAs) for hydropower projects with capacities below 10 MW in a bid to accelerate the development of small and medium-sized hydropower projects. The Ministry of Energy, Water Resources and Irrigation believes that this move will encourage small investors and attract new investments into the hydropower sector.

According to Energy Minister Biraj Bhakta Shrestha, small hydropower projects have been the foundation of Nepal’s hydropower development, and promoting them remains a priority. He noted that many private sector companies that initially started with small projects are now capable of developing projects with capacities of several hundred megawatts.

The private sector is currently also actively involved in developing large and semi-reservoir hydropower projects. Notable examples include the 341 MW Budhigandaki Hydropower Project and the 285 MW Upper Tamor Hydropower Project, both of which are under construction.

Data from the Department of Electricity Development show that 23 projects with capacities below 1 MW have already obtained generation licenses. These projects have a combined installed capacity of 17.65 MW. Similarly, 59 projects with a combined capacity of around 50 MW have applied for survey permits.

The government classifies projects with capacities ranging from 10 kW to 100 kW as micro-hydro projects, while those between 100 kW and 1 MW are categorized as mini-hydro projects. The Alternative Energy Promotion Centre (AEPC) has also been playing a key role in promoting such projects.

Minister Shrestha said that special provisions have been introduced to increase private sector participation in reservoir-based hydropower projects. Under the new provisions, projects with fully secured investment can issue up to 40 percent of their Initial Public Offering (IPO) shares in the very first year, while project licenses can remain valid for up to 50 years.

The government has also adopted a policy of signing new PPAs under the “Take or Pay” model to ensure investment security in the hydropower sector. Accordingly, PPAs for projects below 10 MW have been opened with immediate effect, the ministry said.

Reiterating the government’s commitment to facilitating genuine investors, Minister Shrestha said reforms in the licensing system are necessary to discourage the practice of holding project licenses without implementation. He added that while the energy sector would remain friendly to private investment, governance standards would be strictly enforced.

To expand access to clean energy in rural and remote areas, the ministry has prioritized renewable energy sources such as solar energy, micro-hydropower, biogas, and biomass. Preparations are also underway to legally strengthen the Alternative Energy Promotion Centre and expand its role in rural electrification.

The government is continuing its policy of liberalizing energy trade and is creating an environment that allows the private sector to engage in electricity trading in both domestic and cross-border markets. Legal provisions have also been introduced allowing private investors to build transmission lines and trade electricity based on transmission service charges.

In terms of transmission infrastructure expansion, the government aims to complete 12 transmission lines within the next fiscal year, including nine 132 kV lines, two 220 kV lines, and one line under the Nepal-India Electricity Transmission and Trade Project.

According to the ministry, the total length of transmission lines of 66 kV and above is expected to reach approximately 7,048 circuit kilometers by the end of the next fiscal year. An additional 800 circuit kilometers of transmission lines are planned for completion during the year. The ministry has allocated approximately NPR 46.25 billion for the expansion and upgrading of the transmission and distribution system.

NepalPurbadhar

[ 20 June 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries