energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Raghughat Hydropower Project Intensifies Preparations for Power Generation

With the construction of the 40 MW Raghughat Hydropower Project reaching its final stage, testing of its major physical structures has commenced. The project, promoted by Raghuganga Hydropower, a subsidiary of the Nepal Electricity Authority (NEA), has intensified preparations for power generation.

Testing has begun on the dam located at Dagnam in Raghuganga Rural Municipality-4 and at the foothills of Jhin in Ward No. 5, along with the project’s 6.27-kilometre-long headrace tunnel and two desander ponds. According to Raghuganga Hydropower Managing Director Ganesh KC, water was released into the desander at the dam site on Friday, while the main tunnel is scheduled to be filled with water starting Sunday. He said the project will move into the electricity generation phase once testing of the completed structures and powerhouse equipment is successfully completed.

Construction of the powerhouse at Tilkenichaur has already been completed, with painting works currently underway. One 20 MW generating unit has already been installed, while installation of equipment for the second unit is in its final stage. The switchyard constructed within the powerhouse premises to connect the electricity generated by the project to the national transmission system has been in operation since May 25.

A civil construction contract worth around NPR 6 billion was signed with Indian company Jaiprakash Associates (JP) on November 22, 2017, with a target completion period of 45 months. However, the project was affected by the COVID-19 pandemic, floods, landslides, and shortages of construction materials. Managing Director KC said work is progressing with the goal of completing the project within the fourth extended deadline.

For the installation of electromechanical equipment, a contract worth more than USD 10.293 million was signed with Bharat Heavy Electricals Limited (BHEL) in November 2019. The project is being developed under the Engineering, Procurement and Construction (EPC) model with a concessional loan of USD 67 million from the Export-Import Bank of India, along with joint investment from the Nepal Electricity Authority and the Government of Nepal.

After the agreement with the previous contractor was terminated in 2015 due to financial difficulties, the project was advanced through a new process. The current contractor, JP, began constructing access roads in June/July 2018 and started tunnel excavation in June/July 2019.

The Raghughat Hydropower Project is expected to generate 240.593 million units of electricity annually. The project had already signed a Power Purchase Agreement (PPA) in March/April 2019. The electricity generated will be integrated into the national transmission system through the 220 kV double-circuit Dana–Kushma transmission line under the Kaligandaki Corridor. According to the project, construction of the four required transmission towers and the associated transmission line has already been completed.

Jalasarokar

[ 21 Jun 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries