energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Nepal-India Bilateral Energy Talks in Pokhara A Major Success: Minister Shrestha

Minister for Energy, Water Resources and Irrigation, Biraj Bhakta Shrestha, has stated that the Nepal–India Energy Secretary-Level Meeting held in Pokhara achieved significant progress toward expanding Nepal's electricity market and increasing power exports. He noted that the meeting marked another important milestone toward Nepal's long-term goal of exporting 10,000 megawatts (MW) of electricity to India.

The 13th Meeting of the Nepal–India Joint Steering Committee (JSC) on Energy Secretaries made far-reaching decisions regarding electricity trade and the expansion of cross-border transmission infrastructure. These decisions are expected to further strengthen energy cooperation between the two countries. The meeting agreed to increase Nepal's electricity export capacity to India, accelerate the construction of new cross-border transmission lines, and develop the infrastructure required for long-term electricity trade.

Minister Shrestha expressed confidence that a more favorable environment has now been created for expanding Nepal's clean energy exports to the Indian market. He said this would significantly help reduce Nepal's trade deficit, increase foreign exchange earnings, and strengthen the national economy. Prior to the JSC meeting, Minister Shrestha held courtesy meetings with India's Power Secretary Pankaj Agarwal and Additional Foreign Secretary Munu Mahawar. During the discussions, he emphasized the need to make Nepal–India energy cooperation more result-oriented. He also noted that expanding Nepal's electricity market would encourage greater Indian investment in Nepal's hydropower sector and urged India to facilitate increased electricity exports from Nepal.

The minister further stressed that, alongside electricity generation, both countries should work jointly to develop transmission infrastructure and expand electricity markets. He also highlighted that Nepal's water resources are not merely a source of energy production but are closely linked to human civilization, environmental conservation, and sustainable development.

The meeting, co-chaired by Nepal's Energy Secretary Sarita Dawadi and India's Power Secretary Pankaj Agarwal, agreed to expand the electricity import and export limits between the two countries.

According to the Ministry, the capacity of electricity trade through the existing Dhalkebar–Muzaffarpur 400 kV cross-border transmission line will be increased from the current 1,000 MW to 1,400 MW for imports and 1,650 MW for exports. This decision was based on a study conducted by the joint technical team of both countries and the recommendations of the Joint Working Group (JWG) meeting held a day earlier.

The meeting also approved the Detailed Project Reports (DPRs) for several cross-border transmission lines to strengthen long-term Nepal–India energy trade and agreed to move forward with their construction. The DPR for the Chameliya–Dhauliganga 220 kV double-circuit transmission line, to be built in Nepal's Far Western region, was approved, with a target to complete construction by December 2028.

Similarly, the meeting decided to accelerate the establishment of a joint company by implementing the shareholder and joint venture agreements previously signed between the Nepal Electricity Authority (NEA) and India's Power Grid Corporation for the construction of the Inaruwa–New Purnea and Dododhara (New Lamki)–Bareilly 400 kV transmission lines. Important decisions were also taken to build the additional transmission infrastructure needed to support larger-scale electricity exports from Nepal by 2034–35.

The meeting approved the DPR for the Motihari–Nijgadh 400 kV double-circuit transmission line and also endorsed a proposal to increase the transmission capacity of the Muzaffarpur–Dhalkebar transmission line by installing higher-capacity conductors. It was further agreed to conduct additional technical studies on the feasibility of the Lucknow–Kohalpur–Lamahi 400 kV transmission line and reach a conclusion at the earliest.

The Nepal-side construction of the under-construction New Butwal–Gorakhpur 400 kV cross-border transmission line is targeted for completion by August 2026. However, since the 400 kV substation at New Butwal will not be completed until December 2027, both sides reached a technical agreement to operate the transmission line temporarily at 220 kV until the substation is ready.

Under this interim arrangement, Nepal will be able to import up to 130 MW and export up to 200 MW of electricity immediately.

The Joint Steering Committee (JSC) and the Joint Working Group (JWG), established under the Nepal–India Power Trade Agreement, have been facilitating electricity trade, transmission infrastructure development, and broader energy cooperation between the two countries.

[ 17 Jul 2026 / Spotlightnepal.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries