energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Karnali’s Electricity Access Expansion Accelerating Alongside National Grid: Energy Minister Shrestha

Energy, Water Resources and Irrigation Minister Biraj Bhakta Shrestha has said the government plans to make Karnali a province with electricity services by expanding the national transmission grid alongside micro-hydropower, solar mini-grids and household solar systems at the local level.

Responding to questions related to his ministry at today’s meeting of the National Assembly, Minister Shrestha said electricity access in Karnali was being expanded through alternative energy sources alongside the national transmission network.

According to him, 209 micro and small hydropower projects have been constructed in Karnali through the Alternative Energy Promotion Centre (AEPC). These projects generate 6,719 kilowatts of electricity and have benefited 64,231 households.

Similarly, 23 solar mini-grids are generating 1,709 kilowatts of electricity, providing electricity access to 5,391 households, Minister Shrestha said.

National Transmission Line Yet to Reach 164 Wards

According to Minister Shrestha, of Karnali Province’s 718 wards, 82 have been fully electrified and 472 have been partially electrified through the national transmission line. The national transmission line has yet to reach 164 wards.

“Of Karnali’s 718 wards, 82 have been fully and 472 partially electrified through the national transmission line, while 164 wards are still awaiting access to the national transmission line,” he said. “The government has taken this not merely as a matter of statistics but as a responsibility linked to citizens’ basic services and social justice, and is moving forward with an action plan accordingly.”

A task force comprising the Ministry of Energy, Water Resources and Irrigation, Nepal Electricity Authority and the Alternative Energy Promotion Centre identified 101,187 households and geographical areas in Karnali that had yet to be electrified in 2079 BS and prepared a “Last Mile Electrification Plan.” Minister Shrestha said the plan has already entered the implementation phase.

Surkhet–Dailekh 132 kV Transmission Line Under Construction

Minister Shrestha said significant work was also underway in Karnali on transmission lines and substations.

According to him, the 132 kV Surkhet substation has already come into operation. Meanwhile, the 32-kilometer, double-circuit 132 kV Surkhet–Dailekh transmission line is under construction. The project is targeted for completion by the end of the upcoming Ashadh.

He said programs in the alternative energy sector were also being advanced in parallel.

An 8 MW grid-connected solar power project has been initiated with loan assistance from the Asian Development Bank. Land has already been selected for the project in Dailekh, Rukum West and Jumla, Minister Shrestha said.

He added that programs were being implemented with budget allocations for solar home systems, small hydropower projects and solar mini-grids in remote wards.

‘We Will Provide Quality Electricity Services in Karnali’

Minister Shrestha said the government aims not merely to make Karnali a province with electricity access but to provide reliable, quality and sustainable electricity services across the province.

“Now, the day when Karnali becomes not merely a province with electricity access but one with reliable, quality and sustainable electricity services is not far away,” he said.

For this purpose, the government plans to implement the Karnali Province Electrification Project in two phases, Minister Shrestha said.

Jalasarokar

[ 19 Aug 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries