energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Upper Tamakoshi Nears Profit as Penalties and Interest Expenses Decline

The Upper Tamakoshi Hydropower Project, which had been operating at a loss continuously for four years after beginning electricity generation, is now moving toward profitability in the current fiscal year. According to Purna Gopal Ranjit, Acting Chief Executive Officer of Upper Tamakoshi Hydropower Limited, the company’s financial condition has improved due to better power plant operations, a reduction in hydrology penalties, and successful efforts to lower the interest rate on its long-term loans.

According to him, the company is now in a position to earn a profit of around NPR 1 billion. The improvement has been driven by increased income from electricity generation and sales, along with reductions in hydrology penalties and interest rates.

Recently, Upper Tamakoshi’s revenue from electricity sales has increased. At the same time, the reduction in hydrology penalties and interest rates has provided additional financial relief to the company.

Ranjit said that in the past, the company had to pay hydrology penalties to the Nepal Electricity Authority because it was unable to generate electricity according to the amount of water available in the Tamakoshi River. In fiscal year 2021/22, Upper Tamakoshi paid NPR 3.3 million in hydrology penalties. The penalty increased over the years, reaching NPR 220 million in fiscal year 2024/25.

Over a four-year period, the company paid approximately NPR 1 billion in hydrology penalties. However, Ranjit said that the company did not have to pay any hydrology penalty in the latest fiscal year.

Another major factor behind the company’s improved financial position is its success in reducing the interest rate on its long-term debt.

According to Acting CEO Ranjit, the interest rate on the company’s long-term loans has been reduced from 8.25% to 6.75%. The reduced rate will remain fixed for at least three years. As a result, the company expects to save around NPR 750 million in annual interest expenses, amounting to approximately NPR 2.25 billion in financial-cost savings over three years.

Although the company spent NPR 250 million on reconstructing project structures damaged by floods, Ranjit said that even after accounting for the entire reconstruction expense, the company is still on track to make a profit. WECS To Held Symposium For Nepal’s Super El Nino Readiness And Mitigation Plan.

Spotlight

[ 22 Aug 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries