energyNP.com  
Tel
98510-91900¡¡
Email

Er.energyNP@Gmail.com

      ¡¡ energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
¡¡Air Conditioner
¡¡Battery
¡¡Booster Pump
¡¡Charger
¡¡Cold Storage Room
¡¡Electric Power Tools
¡¡Electric Water Heater
¡¡Garbage Disposal
¡¡Station
¡¡Generator
¡¡Heat Pump
¡¡Inverter
¡¡Lead Acid Battery
¡¡LiFePO4 Battery
¡¡Power Supply
¡¡Rectifiers
¡¡Self Priming Pump
¡¡Solar Energy
¡¡Solar Water Heater
¡¡Transformer
¡¡Treadmill
¡¡UPS
¡¡Voltage Stabilizer
¡¡Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Sankhuwasabha DCC Urges Government to Reject 132 MW Hydropower Project on Barun River

The District Coordination Committee (DCC) of Sankhuwasabha has urged the government not to grant permission for the construction of any hydropower project on the Barun River. The committee has drawn the attention of the Office of the Prime Minister and Council of Ministers, arguing that the Barun River is not only a site of significant religious importance but also lies within the Makalu-Barun National Park and Conservation Area.

In a letter sent to the Prime Minister, DCC Chief Suman Shakya stated that information had been received indicating that certain individuals were pursuing approval procedures for a 132 MW hydropower project on the Barun River. The committee requested that the process be halted.

According to the DCC, energy experts estimate that rivers and streams in Sankhuwasabha, excluding the Barun River, have the potential to generate nearly 6,000 MW of electricity. The letter notes that around 75 MW of electricity is already being produced in the district and connected to the national grid. In addition, projects under development include 3,576 MW on the Arun River alone and approximately 600 MW from other rivers and streams.

The committee argues that refraining from developing a hydropower project on the Barun River would not cause any significant economic loss to either the district or the country, while the proposed project would mainly provide personal benefits to a limited number of individuals.

The letter also cites legal provisions related to infrastructure development in protected areas, maintaining that permission should not be granted for a 132 MW project on the Barun River. According to the DCC, the Supreme Court issued an interim order suspending the implementation of certain provisions of the Policy on Construction and Operation of Physical Infrastructure within Protected Areas, 2008, which had been amended and expanded through a Cabinet decision on May 27, 2021.

The committee claims that, as a result, the original provisions of the policy remain in force. Under those provisions, no structures, including power facilities, may be built within national parks or protected areas. Exceptions may only be granted for electricity projects with a capacity of less than 1 MW, provided they serve local consumers and are not connected to the national transmission grid.

The DCC further noted that the National Parks and Wildlife Conservation Act, 1973 prohibits activities within national parks and reserves that damage forest resources or involve blocking, diverting, or using harmful or explosive substances in rivers, streams, or water sources.

The committee also stated that Bhotkhola Rural Municipality has already decided to preserve the Barun River as a religious heritage site. According to Decision No. 12 of the municipality¡¯s 13th Executive Meeting, the sacred Barun River in Ward No. 4 has been designated as a religious heritage asset, and all hydropower development activities within the river, which lies inside the Makalu-Barun National Park and Wildlife Conservation Area, are to be prohibited.

Based on these legal and policy grounds, the DCC has requested the Prime Minister to ensure that the relevant authorities and officials do not grant permission for any hydropower project on the Barun River.

In the letter issued on August 19, 2026 (Bhadra 3, 2083 BS), DCC Chief Suman Shakya emphasized the need to preserve the Barun River as a river of special religious significance to Sankhuwasabha.

Jalasarokar

[ 26 Aug 2026 / nepalenergyforum.com ]¡¡¡¡¡¡
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

¡¡SYSTEM
¡¡Backup System
¡¡Solar System
¡¡Wind Power System
¡¡Heating System

¡¡AC & Ventilation
¡¡System

¡¡Cold Room System
¡¡Charging System
¡¡for
¡¡Telecom/Industry
¡¡Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¡¯l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries