energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Army Helicopter Lands at Flood-Hit Upper Trishuli-3A, NEA Steps Up Rescue and Power Restoration

A Nepal Army helicopter successfully landed today at the Upper Trishuli-3A Hydropower Project, which was affected by the devastating flood in the Bhotekoshi River, to rescue stranded employees.

According to the Nepal Electricity Authority (NEA), although two landing attempts on Wednesday failed due to adverse weather conditions, the successful landing today has enabled on-site assessment of the project’s actual condition and the extent of flood damage.

Following instructions from Minister for Energy, Water Resources and Irrigation Biraj Bhakta Shrestha, a high-level team led by NEA Executive Director Dirghayu Kumar Shrestha has been deployed to the affected area to expedite rescue operations, field inspections, and power restoration efforts.

The team includes NEA Deputy Executive Director Kiran Kumar Shrestha, Chief of the Distribution and Consumer Services Directorate and NEA spokesperson Rajan Dhakal, and Chirantan Bikram Rana, Chief Executive Officer of NEA Engineering Company, among others.

Meanwhile, efforts are underway to restore electricity supply in flood-affected areas through alternative arrangements. The NEA said power service has already been resumed in Kharanitar, Samudratar, Chaugada, Likhu, and Panchakanya through alternative transmission lines.

Field inspections have also been conducted in other affected areas of Nuwakot district. Preliminary assessments indicate that electricity supply could be restored by energizing the 66 kV transmission line at 11 kV.

Accordingly, technical teams have been mobilized in the field to charge the Chapali–Devighat 66 kV and Balaju–Trishuli 66 kV transmission lines at 11 kV. The teams have intensified the necessary work to restore power services.

The Bhotekoshi flood caused extensive damage to electricity generation, transmission, and distribution infrastructure, making power restoration in the affected areas a major challenge. The NEA said it is continuing efforts to restore electricity services as quickly as possible by utilizing available alternative systems and technical measures.

Jalasarokar

[ 27 Aug 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries