energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Voices heard inside Trishuli 3A tunnel as rescue operation intensifies

A potentially hopeful development has emerged in the ongoing rescue operation at the Trishuli 3A Hydropower Project, with reports that voices of people have been heard from inside the tunnel.

Rastriya Swatantra Party (RSP) lawmaker and engineer Shreeram Neupane, who has been involved in the rescue efforts since the beginning, said information had been received from rescuers that human voices were heard inside the tunnel.

According to Neupane, teams from the Nepali Army and Armed Police Force (APF) have entered the tunnel and intensified the search and rescue operation following the reports.

“Information has been received from the Nepali Army rescue team that human voices have been heard from inside,” Neupane wrote on social media. “The rescue teams of the Nepali Army and Armed Police Force have entered the tunnel and are intensifying the rescue operation.”

He described the reported sound of people speaking from inside the tunnel as an encouraging sign amid the difficult rescue operation.

The latest development has raised hopes that people trapped inside the tunnel may still be alive and could be reached by the rescue teams.

The rescue operation at the Trishuli 3A Hydropower Project has been continuing under challenging conditions following the disaster. Rescue personnel have been working to clear debris and gain access to the affected section of the tunnel.

Earlier updates indicated that the tunnel had been heavily affected by water and debris, making access difficult for rescue personnel. Teams have been using equipment and other measures to open the blocked section and reach those potentially trapped inside.

The confirmation of voices from within the tunnel could provide a critical breakthrough in the ongoing operation. Rescue teams are now working to determine the exact location of the people and establish a safe route to reach them.

Authorities have yet to independently confirm the number or identity of people whose voices were reportedly heard.

The Trishuli 3A project, a 60-megawatt hydropower project, has been at the centre of an intensive rescue effort following the disaster, with security forces and technical personnel working to reach the affected area.

[ 4 September 2026 / fiscalnepal.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries