energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Floods in Budhigandaki and Therang Khola Destroy Two Hydropower Projects

Floods in the Budhigandaki River and Therang Khola at Namrung in Chumnubri Rural Municipality-4 of northern Gorkha have swept away two bridges and two micro-hydropower projects. The disaster has disrupted transportation and electricity services, causing hardships for local residents.

According to local resident Lakpa Dundup Lama, the flood, accompanied by landslides, washed away two bridges along the Manaslu trekking route and damaged two hydropower projects.

The Therang Khola flood destroyed a bridge connecting Namrung to the Manaslu region. Rising water levels in the Budhigandaki River also swept away another bridge located downstream in a forested area near Namrung.

“The flood and landslides have put us at risk,” Lama said. “The bridge leading down from the village is gone, and the bridge leading up is gone as well. We can’t travel anywhere.”

The floods also damaged two micro-hydropower projects that supplied electricity to local communities. One was a newly completed 100-kilowatt project, worth around NPR 70 million, which had just begun test transmission. The other was an existing 22-kilowatt project that had been in operation for years.

“One was a 100-kilowatt hydropower project that had just been completed at a cost of NPR 70 million and was undergoing test transmission, but it was swept away,” Lama said. “The other was a 22-kilowatt plant that had been providing power for years, and that too was completely destroyed. With transportation and electricity cut off, daily life has become very difficult.”

The power outage has affected lighting, communication services, and other electricity-dependent facilities. The destruction of the bridges has also disrupted tourist movement in the Manaslu region, just as the trekking season was beginning. Hundreds of tourists heading toward Larke Pass have been stranded after the Budhigandaki bridge was washed away.

Meanwhile, the District Police Office, Gorkha, reported that floodwaters triggered by landslides also swept away four local houses overnight. The homes belonged to Nurbu Ongyal, Orgen Chhoyden, Lakpa Bhuti, and Mingmar Lama.

“It shook the village like an earthquake,” said Ward Chairperson Pemagyalbo Lama. “Everyone woke up, realized a flood was coming, and ran to safety. Otherwise, the flood would have swept them all away.”

Ward Chairperson Lama said immediate short-term relief would be provided to the four affected families. Each family will receive NPR 20,000 for food and clothing, while the rural municipality is preparing to provide additional assistance worth NPR 100,000 per family within the next few days.

He added that efforts are also underway to secure relief support from other agencies and organizations.

Jalasarokar

[ 6 September 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries