energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Upper Trishuli-3B Rescue Enters New Phase as Three Excavators Reach Site

Search and rescue efforts continue at the Upper Trishuli-3 ‘B’ Hydropower Project, where a large number of people have been missing since the flood. Three large excavators have now been brought through the tunnel to within around 500 meters of the project site.

According to Ananda Dhungel, executive director of Trishuli Hydropower Company, the three excavators were successfully transported through the tunnel to a point approximately 500 meters from the project site at around 7:30 p.m. on Sunday.

The excavators now need to be moved to the actual excavation area, for which an access road is being prepared. Dhungel said the work could take around two to three hours on Monday morning.

Once the access route is completed, excavation and search operations are expected to be intensified from Monday afternoon.

“We finally succeeded in bringing three large excavators through the tunnel to within about 500 meters of the project site at around 7:30 p.m. yesterday,” Dhungel said. “It may take two to three hours to prepare the road needed to take the excavators to the project site. We expect to intensify excavation from Monday afternoon and hope to see some results by the evening.”

Dhungel also expressed hope that the intensified rescue efforts would yield some results by Monday evening and urged people to pray for a positive outcome.

Search and rescue operations at the Upper Trishuli-3 ‘B’ Hydropower Project have remained challenging following the flood, which left a large number of people unaccounted for. Mud, sludge, debris and other materials have accumulated inside the project’s tunnel, making it difficult for rescue teams to reach areas where missing people may be located.

Rescue teams had previously been working to expand access to the project site through the tunnel and bring heavy equipment inside. With three large excavators now positioned around 500 meters from the site, authorities expect excavation and search operations to accelerate.

According to the latest information provided by Dhungel, the necessary access route will be prepared on Monday morning to take the excavators to the final work area. The three excavators will then be used to speed up excavation and search operations from the afternoon.

The latest progress has raised hopes among the rescue teams and families of those still missing. Bringing heavy machinery close to the project site is considered an important step toward increasing the pace of excavation and making tangible progress in the search.

“We hope to bring some results on today,” Dhungel said.

Jalasrokar

[ 7 September 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries