energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Army Vows No Halt to Search for Those Trapped in Hydropower Tunnels

The Nepal Army has said that search and rescue operations inside tunnels of flood-damaged hydropower projects will continue until breakthrough access is achieved in all tunnels. The Army has intensified rescue efforts after estimating that around 121 people may have been trapped inside tunnels of various hydropower projects during the Rasuwa flood.

Speaking at a press conference organized by the National Disaster Risk Reduction and Management Authority on Monday, Nepal Army Assistant Rathi (Major General) Subash Jung Thapa said rescue operations would continue in all tunnels unless the government decides to halt the work.

“The facts indicate that only 121 people entered the tunnels,” he said. “Until every tunnel is fully broken through, we will continue search and rescue operations.”

According to Assistant Rathi Thapa, some workers from the hydropower projects may have been outside the tunnels when the flood struck. He said it is necessary to complete search and rescue operations in all tunnels to accurately determine the number and condition of those trapped inside.

Search Intensified at Multiple Projects

According to the Army, a joint team comprising rescue personnel and project representatives has reached the powerhouse and control point of the Rasuwagadhi Hydropower Project and is conducting search operations.

Similarly, Army rescue teams equipped with specialized gear are continuing search efforts inside the powerhouse and tunnel of the Trishuli-3A Hydropower Project.

At the Trishuli-3B project, troops have entered through Adit-2 and exited through Adit-1. Assistant Rathi Thapa said work is also underway to create access routes through the Adit-2 tunnel so that excavators and heavy equipment can be brought inside.

At Chilime Hydropower, a joint team including foreign technicians is using equipment to remove mud and debris. Additional search operations are also being carried out at the Upper Trishuli-1 Hydropower Project with the support of foreign technical experts, he added.

Flood and Debris Flow Estimated at 180 km/h

Assistant Rathi Thapa said preliminary assessments of the damage inside hydropower tunnels suggest that the floodwaters and debris traveled at an estimated speed of around 180 kilometers per hour.

He said search and rescue operations are being conducted based on the condition of the tunnels, the extent of damage, and potential risks. The Army has mobilized available manpower and equipment to locate those trapped inside the tunnels.

Jalasarokar

[ 7 September 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries