energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  MCA-Nepal completes 18-km transmission line construction to Nepal-India border

The Millennium Challenge Account Nepal (MCA-Nepal) has completed construction of an 18-kilometer section of the cross-border transmission line connecting the 400 kV New Butwal Substation to the Nepal-India border.

According to the MCA-Nepal Development Committee, the completion of the Nepal-side section under the MCC Nepal Compact marks a significant milestone in strengthening Nepal’s power grid and expanding cross-border electricity connectivity.

At the request of the Ministry of Energy, Water Resources and Irrigation, MCA-Nepal expedited construction of the 18-kilometer section and completed it within the stipulated timeframe.

Ghanshyam Upadhyay, chairperson of the MCA-Nepal Development Committee, highlighted the importance of the achievement and thanked the governments of Nepal and the United States, along with the Millennium Challenge Corporation (MCC), for their partnership.

“The completion of this transmission line is a significant achievement in strengthening Nepal’s electricity infrastructure and expanding its cross-border energy network,” Upadhyay said at a program held Sunday at the New Butwal Substation in Nawalparasi (Bardaghat Susta West).

Sunil Poudel, joint secretary at the Ministry of Energy, said the completion reflects Nepal’s progress in strengthening its electricity infrastructure and cross-border connectivity.

“Cross-border electricity connectivity is an integral part of strengthening Nepal’s power generation and transmission capacity,” Poudel said, praising MCA-Nepal’s efforts to complete the work on schedule.

Dirghayu Kumar Shrestha, acting executive director of the Nepal Electricity Authority (NEA), described the project as a significant achievement for Nepal’s energy sector. He said the completion would help Nepal realize greater benefits from a stronger power network between Nepal and India.

MCA-Nepal Executive Director Khadga Bahadur Bista said the agency would now focus on completing the remaining work required to power the transmission line and further strengthen electricity cooperation between Nepal, India and the wider region.

MCC Resident National Mission Director Diane Francisco thanked all those involved in completing the Nepal-bound section, calling the achievement an example of what can be accomplished through collaboration.

With construction of the 18-kilometer Nepal-side section complete, MCA-Nepal has finished its construction obligations for the cross-border transmission line. However, the line can be commissioned only after the remaining permits and regulatory approvals required for cross-border electricity transmission are secured.

The 18-kilometer section is part of MCA-Nepal’s broader power transmission project, which includes construction of a 315-kilometer high-voltage transmission line and three substations, along with technical assistance to the Electricity Regulatory Commission and NEA. The project aims to improve electricity availability and reliability, strengthen Nepal’s transmission network, enhance energy security, and facilitate future power generation and cross-border electricity trade.

[ 13 September 2026 / nagariknetwork.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries