energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  IPPAN seeks special status for flood-hit hydropower projects with exclusive package

The Independent Power Producers’ Association of Nepal (IPPAN) has urged the government to declare hydropower projects affected by the August 26 flood in the Bhotekoshi–Trishuli corridor as ‘Special Flood-Affected Hydropower Projects’ and introduce a dedicated relief and reconstruction package.

At a meeting with Minister for Energy, Water Resources and Irrigation Biraj Bhakta Shrestha on Wednesday, an IPPAN delegation led by President Mohan Kumar Dangi called for comprehensive legal, financial, administrative and regulatory measures to facilitate the reconstruction and rehabilitation of flood-damaged hydropower projects.

IPPAN has proposed the formation of a high-level reconstruction committee under the leadership of the Energy Minister and the immediate introduction of a ‘Special Hydropower Reconstruction and Rehabilitation Procedure, 2026.’ The association said the mechanism should provide a coordinated framework for rebuilding projects and restoring the sector.

According to IPPAN, the catastrophic flood significantly altered the geographical conditions of several hydropower projects—ranging from operational plants to projects under construction and those at advanced development stages. As a result, many projects may now need to be treated almost like new projects, it said.

The umbrella organization has called for an immediate assessment and classification of damage to each project under categories including complete destruction, severe damage, partial damage, disruption of access and transmission infrastructure, and indirect losses caused by prolonged generation shutdown. Such classification, it said, should form the basis for determining appropriate relief, concessions and reconstruction measures.

The proposed reconstruction procedure should integrate issues related to project permits, environmental approvals, forest use, land acquisition, transmission infrastructure, loan restructuring, insurance claims, tax and customs exemptions, power purchase agreements (PPAs) and project completion deadlines, IPPAN said.

Among its key demands are extension of PPA periods, review of PPA rates, expedited settlement of insurance claims, tax and customs exemptions on reconstruction equipment, foreign-exchange facilities for importing replacement equipment, and restoration of damaged transmission infrastructure.

IPPAN has also called for the formation of a high-level steering committee and dedicated task force to coordinate the entire reconstruction process through a single mechanism. It has proposed that the Department of Electricity Development (DoED) serve as the principal implementing and coordinating agency.

It has sought extensions of survey and generation licences, as well as project completion deadlines, based on the extent of damage. Where reconstruction under existing arrangements is not feasible, the government should allow projects to proceed through a new licensing mechanism, according to IPPAN.

IPPAN also highlighted the need to restore transmission and electricity exports. It noted that several hydropower projects unaffected by the flood remain outside the national grid due to damage to transmission infrastructure. The association has therefore called for an immediate transmission and power-export restoration plan, with reconstruction of damaged lines accorded national priority.

To finance reconstruction, IPPAN has proposed establishing a special hydropower reconstruction fund under the Ministry of Finance. The fund could mobilize resources from the government, development partners, concessional lending institutions, climate and green funds, donor agencies, insurance proceeds and private-sector contributions.

The association has also urged the Securities Board of Nepal to facilitate the issuance of rights shares, bonds and green bonds, with priority given to expediting rights-share issuance by affected hydropower companies.

IPPAN has additionally called for new construction standards to ensure that reconstructed hydropower infrastructure is designed to withstand future floods and other climate-related disasters, reducing the risk of similar damage in the years ahead.

[ 17 September 2026 / nagariknetwork.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries