energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Flood sweeps away three towers of 220-kV Kaligandaki Corridor, six hydropower projects affected

Flooding in the Kaligandaki River has swept away three towers of the Dana-Khurkot transmission line, a 220-kV line under the Kaligandaki Corridor, in Annapurna Rural Municipality of Myagdi district.

Damage to the transmission line towers and wires has affected power generation and transmission from six hydropower projects with a combined capacity of 176 MW operating in Myagdi and Mustang.

Annapurna Rural Municipality-2 Ward Chair Om Phagami said the flood swept away two transmission line towers beyond Bhirkate in Dowa, Annapurna Rural Municipality-1, and one tower at Dhirchyang.

The 5-MW Ghalemdi Khola, 42-MW Mristikhola, 38-MW Nilgiri-1, 71-MW Nilgiri-2 and 6-MW Rele Khola hydropower projects in Narchyang, Annapurna Rural Municipality-4, which have been supplying electricity to the national grid through the Dana-Khurkot transmission line, have been shut down.

Similarly, electricity generated by the 14-MW Thapa Khola Hydropower Project in Tukche, Mustang, has not yet been connected to the national grid. Meanwhile, the 14-MW Gharkhola Hydropower Project in Pokharebagar, Annapurna Rural Municipality-4, has remained shut since the last week of Shrawan after its powerhouse was buried by a landslide.

The transmission line towers were damaged by flooding in the Kaligandaki River following rainfall from Asoj 8 to 11. The flood has also eroded several sections of the Beni-Jomsom road under the Kaligandaki Corridor.

According to journalist Ganesh Gurung (Suren), who walked from Beni to Shik via Pokharebagar on Monday, several sections of the Beni-Pokharebagar road have subsided, been eroded or covered by landslides. He also said electricity wires and poles had been damaged.

The 180-MW Kaligandaki Garg and 66-MW Madhya Kaligandaki hydropower projects under construction in Annapurna Rural Municipality have also been affected by the floods and landslides.

Roshan Khadka, chief of the Nepal Electricity Authority¨s Pokhara Grid, said the transmission line towers between Dana in Annapurna Rural Municipality-3 and Pokharebagar had been damaged by the disaster. He said a technical team had been sent by road to conduct an on-site inspection of the damage.

Khadka said the authority was coordinating efforts to adopt alternative arrangements to supply electricity to northern Myagdi and Mustang while simultaneously moving ahead with reconstruction of the damaged transmission line.

The flood and landslides have also damaged structures of the old 33-kV transmission line. Although efforts are underway to supply electricity to Mustang from the Dana Substation, the authority said it has been difficult to assess the condition of the damaged towers due to problems with road access and communication.

Road connectivity to Mustang has been disrupted due to the floods and landslides. The disruption of mobile and internet services amid the power shortage has further affected daily life in the district. Local authorities said electricity, road and transportation services have also been disrupted in rural areas of Mustang, Myagdi and Baglung.

Nepalpurbadhar

[ 29 September 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¨l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries