energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Transmission charge for national grid fixed at Rs 413,000 per MW

The Electricity Regulatory Commission (ERC) has determined the transmission charges for using the national electricity transmission grid operated by the Nepal Electricity Authority (NEA). For fiscal year 2026/27, the commission has set the transmission charge at Rs 413,000 per MW per month for medium- and long-term open access, and 57 paisa per kilowatt-hour for short-term open access.

The commission said it has issued the National Electricity Transmission Grid (National Transmission Grid) Transmission Charge Calculation Standard, 2026 to determine the charges for using the transmission system under the national transmission grid. The standard came into effect on September 16, 2026.

The standard was issued pursuant to Section 13 of the Electricity Regulatory Commission Act, 2017, and Rule 13 of the Electricity Regulatory Commission Regulations, 2018, as well as Section 33 of the Directive on Open Access to Electricity Transmission and Distribution Systems, 2025.

The standard sets out the methodology for calculating transmission charges for the national transmission grid, as well as the basis for various expenses and returns to be included in the annual revenue requirement. According to the commission, the annual revenue requirement will take into account depreciation, interest on loans, employee and operating expenses, costs related to transmission services, returns on equity investment, foreign exchange-related expenses, income tax and other relevant costs.

The commission said the transmission charges have been determined with the objective of ensuring the full and fair recovery of the annual revenue requirement of the authorized entity for using the transmission system. The standard allows charges to be determined based on installed capacity, i.e. per megawatt, or the volume of electricity transmitted, i.e. per kilowatt-hour, depending on the capacity and energy flow through the transmission system.

For determining the charges for fiscal year 2026/27, the commission said it used NEA¨s audited financial statements for fiscal year 2024/25, along with the annual revenue requirement estimates submitted by the authority for fiscal years 2025/26 and 2026/27.

Accordingly, the charge for medium- and long-term open access has been set at Rs 413,000 per MW per month, which amounts to Rs 4.956 million per MW annually. Similarly, the charge for short-term open access has been fixed at 57 paisa per kilowatt-hour.

The provision will be significant for electricity producers, traders and other authorized users accessing the national transmission grid on an open-access basis. The standard provides greater certainty in determining the cost of using the transmission system by establishing a clear basis for calculating open-access charges.

However, the decision does not cover charges for radial and dedicated transmission facilities outside the national transmission grid. The commission said it is proceeding with the process of issuing a separate directive to determine transmission charges for such facilities.

According to the commission, the full text of the National Electricity Transmission Grid (National Transmission Grid) Transmission Charge Calculation Standard, 2026/2027 is available on its website.

Jalasarokar

[ 29 September 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¨l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries