- Design, Supply & Construction, Delivery, Installation/Erection, Testing & Commissioning of 33/11 Kv,3MVA Substation at Kamalbazar Achham
Deadline: 2017-09-12
- Repair and maintenance of francis runner and other turbing parts of marsyangdi hydro power station
Deadline: 2017-09-10
- Repair and Maintenance of Transformer
Deadline: 2017-08-30
- Supply, delivery, installation and rehabilitation of 11/0.4-0.23 kV electrical distribution network at the distribution area of
03-Timal Gramin Samudayik Bidhutikaran Sahakari Sanstha Ltd., Timal, Ka
04-Damek Samudayik Gramin Bidhut Upabhokta Samiti, Damek, Baglung
05-Gramin Samudayik Biddhut Upabhokta Samiti, Phirphire, Tanahu
06-Simthali Samudayik Gramin Bidhutikaran Upabhokta Sanstha, Simthali
07-Wami Gramin Bidhyut Upabhokta Samiti, Wami, Gulmi
Deadline: 2017-08-27
- Construction of 11 KV Control Building & Equipment shifting Project, supply, delivery and installation of 11 KV XLPE cable & shifting of 11 KV switchgear at Lamahi substation
Deadline: 2017-08-25
- Supply, delivery, installation/erection, testing and commissioning of 11/0.4-0.23 kV electrical distribution network at the distribution area of
01-Basanta Samaj Bikash Kendra, Basantapur, Terhrathum
02-Panchadhura Samudayik Bidhutikaran Upabhokta Samuha
Deadline: 2017-08-25
- Supply and delivery of Generator Air Cooler
Deadline: 2017-08-24
- Dismantle, repair, testing and reinstallation of MIV
Deadline: 2017-08-24
- Transportation of Line materials from Nepalgunj to Humla, Simikot To Erection Site (including loading and unloading) & Line Erection works at
01-Dandaphaya and Shyada VDC
02-Simikot,Bargaun,Thehe and Kharpunath VDC
03-Lali,Raya,Gothi(Talchadi),Kharkhola Dharma , Rodikot SHP VDC
Deadline:2017-08-21
- Supply, Delivery, Installation, Testing & Commissioning of 12KV, VCB.
Deadline: 2017-08-13
- Retrofitting work in Barrage, Intake and Control room of SHPS
Deadline: 2017-08-13
- Rural Electrification Work at Different Places in Surkhet District
Deadline:2017-08-13
- Rural Electrification Work at
01-Khalanga, Kalegaun, Chhepka, Dalli, Khagenkot and Bhagavati in Jajarkot District
02-Rawatgaun, Aali, Bhurchaur,Damarbazar, Phera and Karkigaun in Jajarkot District
03-Jagatipur, Dhaira, Matela and Barela in Jajarkot District
04-Punma, Army Barrack, Kalabhur and Laha in Jajarkot District
06-Bohara, Khalanga, Army Post and Jagatipur in Jajarkot District
07-Chhedabazar, Simalchaur-Bahundanda and Thala Raikar Salleri in Jajarkot District
05-Distribution Line Improvement Work at Khalanga and Sangta Site in Bheri municipality of Jajarkot District
Deadline: 2017-08-13
- Installation of 11/0.4/0.23 kV distribution line and distribution transformer
Deadline:2017-08-11
- Electrification work at Bankatuwa VDC
Deadline:2017-08-08
- Construction of HT/LT Line & Transformer Installation Work at
01-Harjang, Aresh, Badachaur and Sirpa VDC in Rolpa District
02-Ghartigaon, Korchbang, Bhabang and Rangsi VDC in Rolpa District
03-Hwama, Jankot, Kotgaon VDC and Liwang Municipality (Harigatina area) in Rolpa District
04-Fagam, Tebang, Jaimakasala, Jaulipokhari and Jedbang VDC in Rolpa District
05-Budhagaon, Jungar, Nuwagaon, Gairigaon, Kareti, Sakhi, Jhenam, Dubring, Dubidada and Masina VDC in Rolpa District
06-Pang, Dhabang, Gajul, Mijhing, Ghodagaon and Gumchal VDC in Rolpa District Rural Electrification
Deadline:2017-08-06
- Installation/Erection,Upgradation,Commissioning & Testing and Handover of 11/0.4/0.23kv Distribution Line in
01-Puranagaun,Chanakhu,Gelu VDCs and Manthali Municipality of Ramechhap District.
02-Himganga,Rampur,Ratmata-Pokubase,Saghutar,Deurali,Gothgaun VDCs and Ramechhap Municipality of Ramechhap District.
03-Bhirpani,Gaganbhadaure,Khadadevi,Majuwa,Makdum,RakathumChapadi Pakarbas VDCs of Ramechhap District.
04-Bhetan,Dimipokhari,Hiledevi,Khaniyapani-Lubughat of Ramechhap District.
05-Lakhanpur,Lakhanpur-9,Gauswara,Tokarpur,Daduwa,Doramba VDCs of Ramechhap District.
06-Bijulikot,Naghdaha,Saipu and Tilpung VDCs of Ramechhap District.
07-Those and Chuchure VDCs of Ramechhap District.
08-Preeti,Bamti-Bhandar,Kubukasthali VDCs of Ramechhap District.
Deadline:2017-08-04
- Rural Electrification
14-Construction of HT/LT Dis. Line and Installation of Transformer at different places of Ghiring Sundhara, Tanahun District
15-Construction of HT Line at Bhanumati, Tanahun (Bhanumati to Chitre Vanjyanj)
Deadline:2017-08-02
- HT/LT line extension and Transformer installation
Deadline: 2017-07-30
- 20-Repair, maintenance & installation of hydraulic pump & fuel pump of PC-300 hydraullic excavator along with repair & maintenance and installation of lift cylinder, tilt cylinder and booster cylinder of
21-Supply, delivery and installation of hydraulic pipes of different sizes for 912 Litronic Liebherr Hydraulic at Sunkoshi HPS
22-Supply, delivery and installation (fitting works & required works for fitting) of final drive case of PR 751 Liebherr Bulldozer at Sunkoshi HPS
Deadline:2017-07-30
- 04~08- HT/LT Line Extension and transformer Installation
09-Meter Reading work
10-Renovation work of Staff Quarter (Salyantar )
Deadline:2017-07-30
- Supply, delivery, installation / erection, testing and commissioning of 33KV transmission line
Deadline:2017-07-30
- Rural Electrification Work at
02-Dadaparajul, Awalparajul, Belpata, Lakui, Piladi & Khadkabada in Dailekh District
03-Baraha, Badabhairab, Lalikada, Paganath, Bindhyabasini, Katti Vdc & Narayan Municipality in Dailekh District
04-Bhairikalikathum, Layati Bindrasaini, Jammukadh, Tilepata, Kusapani, Rawatkot, Badakhola & Raniban Vdc in Dailekh District
05-Malika, Kalbhairab, Kharigaira Vdc & Dullu Municipality in Dailekh District
06-Bhawani, Chauratha, Salleri, Baluwatar, Toli, Dwari, Naumule, Basi & Goganpani Vdc in Dailekh District
Deadline:2017-07-30
- Supply, delivery, testing and commissioning of transportable submersible dewatering pump
Deadline: 2017-07-30
- Supply and Delivery of Transfomer Oil
Deadline: 2017-07-30
- 04~08- HT/LT Line Extension and transformer Installation
09-Meter Reading work
10-Renovation work of Staff Quarter (Salyantar)
Deadline: 2017-07-30
- Design, Supply and Install-EPC
Design, Manufacture, Supply, Installation, Testing and, Commissioning of Transformer Test Bench at Biratnagar, Butwal and Nepalgunj
Deadline: 2017-07-26
- Rehabilitationg of LT/HT line at different places of
13-Baidi and Bhirkot V.D.C of Tanahum DCS
14-Bandipur municipality, Deurali and Chhipchhipe V.D.C of Tanahum DCS
15-Aabu municipality and Chhimkeshwori V.D.C of Tanahum DCS
16-Bhanu municipality of Tanahum DCS
17-Chhang and Ghasikuwa V.D.C of Tanahum DCS
18-Jamune, Manapang and Shyamgha V.D.C of Tanahum DCS0
19-Kahushivapur and Keshavtaar V.D.C of Tanahum DCS
20-Mirlung and Purkot V.D.C of Tanahum DCS
21-Risti and TanahumSOOR V.D.C of Tanahum DCS
22-Satishwara and Basantapur V.D.C of Tanahum DCS
23-Byas municipality of Tanahum DCS
24-Rehabilitation of LT/HT LINE AT DamaulI and thappu no-light area of Tanahum DCS
25-Rehabilitation work of Various load centers under thappu no-light area of Tanahum DCS
26-Rehabilitation work of Various load centers under thappu no-light area of Damauli no-light area of Tanahun DCS
27-Rehabilitation of LT/HT line at Dumre and Aabu Sub-branch area of Tanahun DCS
Deadline:2017-07-23
- 05/06-Rural Electrification
07-HT Line Construction
08-Distribution line construction
Deadline:2017-07-20
- Supply and Delivery of Three Phase Digital Power Analyzer with Internationally Accreditated Third Party Calibration
Deadline:2017-07-19
- Battery Bank supply work
Deadline:2017-07-19
- Repair and Maintenance of Francis Runner and Other Turbine Parts of Marsyangdi Hydro Power Station
Deadline: 2017-07-19
- 18-Supply and Delivery of Super Enameled Copper Wires and Paper Insulated Copper Strips
19-Design, Supply, Delivery, Installation, Testing, Commissioning and Training of Double Girder 5 Ton Capacity Heavy Duty EOT Crane for Central Workshop, NEA.
20-Supply of Security Services for Central Workshop, NEA, Hetauda
21-Supply and Delivery Supply and Delivery of Stationery and other Accessories
22-Supply and Delivery of Three Phase Digital Power Analyzer with Internationally Accreditated Third Party Calibration
Deadline: 2017-07-19
- Supply, delivery, installation, testing and commissioning of 33/11 KV 3.5 MVA power transformer at Chatara hydro power station
Deadline: 2017-07-19
- Supply and Delivery of Transformer, Conductor, ABC Cable and Accessories
Deadline: 2017-07-19
- Rural Electrification and Distribution System Reinforcement of Makwanpur District
Deadline: 2017-07-18
- HT/LT Line Extension and Transformer Installation Work
Deadline: 2017-07-17
- Construction of Staff Quarter and Miscellaneous Works at Lahachowk substation
Deadline: 2017-07-16
- 09-HT/HT line extension & transformer installation at
10-Kallery, Alleri, Goganpani, Baireni
11-Khari, Dhola, Chainpur
12-Thakre, Tasarpu, Kewalpur, Bhumisthan
13-Semjong, Marpak, Katunje
14-Lapa, Sertung
15-Kumpur, Nalang, Salang
16-For Voltage Sudhar Work
17-Pida, Gajuri
Deadline:2017-07-14
- Rural Electrification Work at
01-Kunathari, Gutu and Bijaura in Surkhet District
02-Neta, Kalyan, Lekhafarsa, Ratu, Satakhani and Lekhaparajul in Surkhet District
03-Dahachaur, Mehalkuna, Chhinchu & Lekhgaun of Surkhet District
04-Kunathari, Malarani, Maintada and Gadi in Surkhet District
05-Satakhani, Dasharathpur, Malarani, Lekhagau, and Ghumakhare in Surkhet District
Deadline: 2017-07-13
- Supply and delivery of computer hardware and network components
Deadline: 2017-07-13
- Steel Plate Jacketing work on face of Piers at SHPS
Deadline: 2017-07-13
- 14-Supply, Delivery, Installation, Testing, Commissioning & Realy panel at BhairahawaSub-station.
15-Supply, Delivery, Installation, Testing, Commissioning Sub-station Equipment for line bay at Amuwa Sub-station.
Deadline:2017-07-12
- Installation/Erection, Testing, Commissioning And Handover of HT/LT Line & Transformer
Deadline: 2017-07-11
- Installation/Erection, Commissioning & Testing and Handover of 11/0.4/0.23 kv Distribution Line in
01-Dadakharka, Boch, Dudhpokhari, Pawati, Shailungeshwor, Phasku, Bhedpu, Bhusapheda, Kabre, Chetrapa, M
02-Bhedpu, Bhirkot, Bhusapheda, Chetrapa, Chankhu, Dadakharka, Dudhpokhari, Lakuirdada, Gairimudi, Ghyangsukathokar, Jugu, Kabre, Katakuti, Magapauwa, Marbu, Melung, Mirge, Namdu, Pawati, Phasku, Shyama and Shailungeshwor VDCs and Jiri Municipality of Dolakha District. Issued by Dolakha Distribution Centre
03-Alampu, Babare, Bigu, Chilankha, Jhyaku, Kalinchowk, Khopachaku, Lamidada, Lapilang, Mali, Suspachemawati, Sundrawati, Sunkhani and Suri VDCs of Dolakha District
Deadline: 2017-07-11
- 11/0.4/0.23 kV Line Construction Works Rural Electrification Works at
04-Bhotekoshi Gaupalika of Sindhupalchok District
05-Barabishe Nagarpalika of Sindhupalchok District
06-Sunkoshi Gaupalika of Sindhupalchok District
07-Lisankhu Pakhar Gaupalika of Sindhupalchok District
08-Balephi Gaupalika of Sindhupalchok District
09-Tripura Sundari Gaupalika of Sindhupalchok District
10-Jugal Gaupalika of Sindhupalchok District
11-Chautara Sagachowkgadi Nagarpalika of Sindhupalchok District
12-Indrawati Gaupalika & Chautara Sagachowkgadi Nagarpalika of Sindhupalchok District
Deadline: 2017-07-10
- Rehabilitation & Upgrading of HT/LT Liine & Replacement of ACSR LT Conductor with ABC Cable
Deadline: 2017-07-09
- Construction of HT/LT Distribution Line at different Places of Kaski District
Deadline: 2017-07-09
- 15-for water level viewing of intake and tail race side
Supply, Delivery, Installation, Testing & Commissioning of water level sensors for Head Race & Tail Race at GHPS
16-Supply,Delivery,Installation,Testing of Electrical Spare parts at GHPS
Deadline: 2017-07-06
- Procurement of Plant Design, Supply, Installation, Testing and Commissioning of 132 kV Biratnagar Substation
Deadline: 2017-07-05
- Survey & lab equipments
Supply and Delivery of survey & lab equipments
Deadline: 2017-07-04
- Construction and Maintenance of LT Line at Kusma
Deadline: 2017-07-03
- 11-Supply & Delivery of Line Materials
12-Line Construction & Upgrading,11KV HT Line Extension & Conductor Upgradation Works
Deadline: 2017-07-02
- Installation/Erection, Commissioning & Testing and Handover of 11/0.4/0.23 kv Distribution Line in Suri, Marbu, Chankhu, Babare, Khopachaku VDCs of Dolakha District
Deadline: 2017-06-30
- Rural Electrification Works at Kalleri VDC of Dhading District
Deadline: 2017-06-29
- Installation/Erection of Distribution Transformer and
1-LT line extension work at Bankatwa V.D.C.
2-LT line extension work at Titihiriya V.D.C.
3-Upgrading of Existing HT/LT line at Chisapani V.D.C.
4-LT line extension work at Kohalpur-10, Ramnagar Area
5-Upgrading of Existing HT/LT line at Titihiriya V.D.C. & Kohalpur
Deadline: 2017-06-29
- Construction of Counter Shed
Deadline: 2017-06-27
- Supply, Delivery, Installation, Testing and Commissioning of CCTV cameras & its accessories at Powerhouse of KL1 HPS
Deadline: 2017-06-23
- Design, Supply, Delivery, Construction, Installation, Testing And Commissioning Of 33KV, 11KV Line and 33/11 KV Substation At
01-Bhagwanpur, Siraha
02-Rakathum, Ramechhap
03-Haripurwa, Basantpur, Sarlahi
04-Gadhiya Dumariya, Sarlahi
Deadline: 2017-06-18
- Rural Electrification Works (Construction of LT Line) at
02-Baglung Municipality
03-Bihukot VDC (former)
04-Dudhilabhati VDC (former)
05-Righa VDC (former)
06-Kandebash VDC (former)
07-Pandhavkhani VDC (former)
08-Rankhani VDC (former)
09-Maldhunga -Bhakunde
10-Salyan VDC (former)
11-Sarkuwa VDC (former)
12-Paiyunthanthap VDC (former)
13-Amarbhumi VDC (former)
14-Argal VDC (former)
Deadline: 2017-06-15
- Supply and Delivery of 36 KV SF6 Circuit Breaker , 36KV Transformer And 30KV Lightening Arrestor
Deadline: 2017-05-30
- Supply, delivery, installation, testing and commissioning of batching plant at Tankisinuwari, Morang
Deadline: 2017-05-14
- Supply and Works for the Rehabilitation/Upgrade of the existing Load Dispatch Centre (LDC) at Siuchatar, Kathmandu and for a Back-up LDC to be implemented at different location
Deadline:2017-05-10
- 01-Electrcals,NEA Janakpur Regional Office
02-Installation, Erection, Testing and Commissioning of 11 kV Distribution Line
Deadline: 2017-05-09
- Power House Equipment
Supply, Delivery, Testing & Commissioning of Lathe Machine at GHPS
Deadline: 2017-04-28
- For 48v DC battery bank for communication
Supply, Delivery, Installation,Testing & Commissioning of 48v,200Ah Battery Bank at GHPS
Deadline: 2017-04-28
- Nepal Electricity Authority has received financing assistant from the Asian Development Bank with co-financing from Norway and loan from European Investment Bank toward the cost of Safeguards Implementation and Monitoring Work of SASEC Project and intends to apply part of the proceeds for consulting services
Deadline:2017-03-24
- Consulting Services for Engineering and Environmental Study of Kohalpur-Surkhet-Upper Karnali 400kV Transmission Line and Kohalpur-New Butwal 400kV Transmission Line under the Project Preparatory Facility for Energy
Deadline:2017-03-15
- Nepal Electricity Authority (NEA), intend to construct Upper Arun Hydro-electric Project (UAHEP) and IkhuwaKhola Hydropower Project (IKHP) located in Sankhuwasabha district of eastern development region. The Environment and Social Studies Department (ESSD) of the Engineering Service Directorate of NEA is conducting Fisheries baseline study of Upper Arun Hydroelectric project as a part of Environment and Social Impact Assessment (ESIA) of the proposed Project. The ESSD is seeking qualified national consulting firm for the collection of site specific baseline data for the fisheries and aquatic wildlife study in and around Upper Arun and Ikhuwa Khola. The task to be completed under this assignment will be site specific and conducted at local level.
Deadline:2017-03-05
- The Government of Nepal has allocated funds towards the cost of Rehabilitation of existing 33/11 kV Substations and Nepal Electricity Authority intends to apply part of the funds to cover eligible payments under the Contract for ICB/PTSD/2073/074-01"Rehabilitation of Existing 33/11 kV Substations." Bidding is open to all eligible Nepalese and Foreign Bidders.
Deadline:2017-02-28
- The Government of Nepal has received a Grant from the KfW Development Bank (KfW) towards the Reconstruction and Improvement of Electricity in Earthquake affected Districts Project. Part of this grant will be used for payments under the contract named above. Bidding is open to all Bidders without nationality restrictions.
Deadline:2017-02-14
- The Government of Nepal has obtained financing from the World Bank toward the cost of Power Sector Reform and Sustainable Hydropower Development Project (PSRSHDP) and Nepal Electricity Authority (NEA), as one of the implementing agencies,intends to apply part of the proceeds to procure consulting services for Environmental and Social Impact Assessment (ESIA), Cumulative Impact Assessment (CIA) and Social Planning Studies (SPS) of Upper Arun Hydroelectric Project (UAHEP),and IkhuwaKhola Hydropower Project (IKHPP) (“the Projects”).
Deadline:2017-02-13
- Procurement of Plant for Udipur-Markichowk-Bharatpur 220 kV Transmission Line (Design, Supply and Install) Single-Stage, Two-Envelope Bidding Procedure
Deadline:2017-01-15
|