energyNP.com Logo  
Tel
98510-91900 
Email
energyNP@hotmail.com 
wind power solar hydro power
  Menu

 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
 
   

Nepal Energy

News 2025

Energy / Power
Solar Energy / Wind Power / Hydro Power
AC / Battery / Wire / Engine / Parts
Construction / Telecom / Air / Others
 

  
NOC hikes price of petrol and diesel [250630]
  
Rising Hydropower Moves Toward IPO with Muktinath Capital Partnership [250630]
  
Authority Causes Delay in Airport Fuel Storage Relocation [250630]
  
CAAN inaction delays TIA fuel depot relocation [250630]
  
NICCI and FICCI sign MoU to boost bilateral trade and investment between Nepal and India [250629]
  
Hydropower Leads Market Decline as NEPSE Drops 33 Points [250629]
  
Construction Underway for Myagdi Khola-B Project, Commercial Operation by 2028 [250629]
  
Fuel import costs decrease despite increasing consumption [250629]
  
FNCCI President Dhakal Urges China for Cooperation in Technology and Innovation [250628]
  
Tamakoshi Hydropower Begins Round-the-Clock Electricity Production [250628]
  
China Commits to Boosting Nepal’s Energy Infrastructure with Technical and Financial Aid [250627]
  
IPPAN welcomes removal of 'take and pay' in PPAs [250627]
  
Nepal promotes infrastructure investment opportunities at Global Economic Forum [250627]
  
Minister Khadka stresses innovative cooperation for energy security [250627]
  
3.6 million litre aviation fuel depot constructed at PRIA [250627]
  
Energy Minister Khadka and Administrator of NEA meet [250627]
  
Barun Hydropower to issue Rs 535.8 million rights shares from July 15 [250627]
  
Khanikhola Hydropower to issue rights shares worth Rs 465.7 million [250627]
  
Uncertainty looms over 500 MW electricity export to Bangladesh from Upper Karnali Hydro [250626]
  
Energy Minister Khadka Highlights Nepal’s Growing Electricity Exports and China Transmission Line Project [250626]
  
Government Decides: Water Resources Bill Will Proceed [250626]
  
NEPSE Dips Slightly; Modi and Tehrathum Hydropower Hit Positive Circuit [250625]
  
Electricity exports to India surge as monsoon boosts hydropower production [250625]
  
Petroleum imports generate Rs 73 billion in revenue, highest among all products [250625]
  
Birgunj Customs Office collects Rs 73.18 billion in revenue from petroleum products [250625]
  
Govt revokes disputed ‘take and pay’ provision for hydropower sector [250625]
  
Petroleum products worth Rs 18 billion imported via Kakarbhitta [250624]
  
Budget clause amended following ‘take and pay’ hydropower dispute, FinMin proposes revision [250624]
  
MD Shakya Inspects New Bharatpur 220 kV Substation [250624]
  
Budget Revision: Oli–Deuba Pact to Eliminate ‘Take and Pay’ Policy [250624]
  
NC, UML agree to scrap 'Take-or-Pay' and 'Take-and-Pay' provision from PPA [250624]
  
Energy Minister Khadka Departs for China to Attend Energy Summit [250624]
  
Test production begins at Chimkhola-Mangale-Rahughat Hydropower Project in Myagdi [250624]
  
Lawmakers, experts slam 'take and pay' provision in budget [250624]
  
PM Oli orders swift action on Dailekh methane gas and Dhauwadi Iron mine production [250623]
  
Future of Nepal-Bangladesh Power Trade Uncertain as India Corridor Raises Concerns [250623]
  
Stakeholders Seek Commitment for Transmission Line in PPA [250623]
  
Private Sector Set to Access Electricity Transmission for Buying and Selling: Draft Directive [250623]
  
Govt under pressure to revoke mandatory take-and-pay policy for hydropower projects [250623]
  
Methane reserve offers hope to slash fuel imports, ensure energy security [250623]
  
BYD Dolphin 2025 launched in Nepal with first LFP low-voltage battery [250622]
  
Energy Producers Threaten License Return; PM Vows Resolution by Monday [250622]
  
Petroleum products worth Rs 174 billion imported via Birgunj border in 11 months [250622]
  
Outer Ring Road project stalled for 24 years despite Rs 150 million spent [250622]
  
Energy Developers Urge Withdrawal of ‘Take and Pay’ Provision Through Mass SMS Campaign [250621]
  
FDI commitment reaches Rs. 60 billion [250621]
  
MCC Work Must Accelerate to Boost Nepal’s Infrastructure and Development [250620]
  
Eastern Industrialists Call for Action on Frequent Power Tripping [250620]
  
Nepal imports EVs worth Rs 31.55 billion in 11 months of current fiscal year [250620]
  
Energy entrepreneurs announces protests against 'Take-and-Pay' PPA provision in new budget [250620]
  
Large Natural Gas Reserve Revealed in Dailekh Through China-Nepal Joint Study [250619]
  
NEA and Energy Ministry Lag in Recovering Billions from Industrial Power Dues [250619]
  
13th Nepal-China's Xizang Economic and Trade Facilitation Committee Meeting concludes [250619]
  
Now it's confirmed, Jaljale in Dailekh has large reserve of methane [250619]
  
Govt unveils draft law allowing private firms to sell electricity directly to clients [250619]
  
Energy Producers Demand Three Alternatives from Finance Minister on ‘Take and Pay’ Provision [250618]
  
Interaction on Nepal-China trade facilitation and border management held [250618]
  
Chino Khola Hydropower concludes financial closure with Rs 1.35 billion Everest Bank loan [250618]
  
MCC Nepal Compact exempted from US aid pause, implementation to continue [250618]
  
Surge in construction loans to 12.3 percent spark optimism for economic recovery [250618]
  
Nepal Begins Electricity Export to Bangladesh [250617]
  
Air Pollution Is The Number One Health Risk Factor In Nepal [250617]
  
Foreign aid shrinks amid weak spending capacity, delays in project implementation [250617]
  
Finance Minister Paudel firm on ‘Take and Pay’ provision [250617]
  
Upper Trishuli–1 Hydropower Handed Over Ambulance to Project Affected Uttargaya Rural Municipality [250616]
  
Lock-in period of shares in five hydropower companies set to expire within in a month [250616]
  
Landslide obstructs Kaligandaki corridor [250616]
  
President Paudel briefed about hydropower projects [250616]
  
Electricity of Rele Khola connected to national grid [250616]
  
NOC hikes fuel prices effective from today [250616]
  
Gwarko overpass to open for vehicles in four days [250616]
  
Kulman Ghising felicitated in Nijgadh For Serving People Ending Load-Shedding [250615]
  
681 mw power to be generated from Humla Karnali Cascade Hydropower Project [250615]
  
Rapti Hydro issues rights shares worth Rs 612.7 million [250615]
  
Power export to Bangladesh resumes, to continue for 5 months [250615]
  
NEA In A Difficult Situation: MD Shakya [250614]
  
Keeping NEA Intact: No to Unbundling or Privatization [250614]
  
Weekly Stock Report: Hydropower Investors Lead the Gains [250614]
  
Govt ‘positive’ to review controversial take-and-pay provision on hydropower companies [250614]
  
Budhiganga Project Stalled in Preparatory Phase [250613]
  
SEBON’s Letter Urges Stricter IPO Pre-Approval for Hydropower Companies [250613]
  
NEA in Financial Profit Yet Operationally Strained, Says Shakya [250613]
  
WB positive to conclude financial management of Upper Arun Hydroelectric Project soon [250613]
  
Him Star Urja IPO issued for affected local, overseas Nepalis [250613]
  
Global IME Bank leads investment in Upper Mewa Khola Hydropower Project [250613]
  
Foreign Minister of Nepal Seeks Renewable Energy Ties with India [250612]
  
East-West Highway obstructed in Nawalpur [250612]
  
Status of capital market in last 10 months of FY 2024/25 [250612]
  
Minister Khadka urges WB to speed up financing for Upper Arun Hydropower Project [250612]
  
Civic Tribute to Kulman Ghising for Historic Energy Leadership [250612]
  
FNCCI President Dhakal Meets Top Leadership of IOE and WTO [250611]
  
14,500 e-vehicles imported in 10 years [250611]
  
NIFRA issues public green bond worth Rs 5 billion aiming to finance green energy production [250611]
  
270-MW semi-reservoir-based project to be developed in Bheri [250611]
  
Huawei Nepal Launches FusionCharge EV Network on World Environment Day [250610]
  
Hydroelectric Projects Generate Rs 1.73 Billion in Royalty [250610]
  
Gandak West Canal Basin built, irrigation expanded [250610]
  
Binayi Khola bridge to be operated from June 28 [250610]
  
Chandra Prasad Dhakal: Private Sector First [250609]
  
Bailey bridge fixing works intensified in several places [250609]
  
Minister Khadka opens Settling Basin under Nepal Gandak West Canal Irrigation System [250609]
  
FNCCI president Dhakal calls for investment-friendly reforms [250609]
  
Four Hydropower Firms to Exit Lock-In Period by Mid-July [250609]
  
Muglin-Pokhara road expansion: 53 percent works completed in western section [250609]
  
Birgunj Customs Office revenue dependent on petroleum and vehicle imports [250609]
  
Sanvi Energy Ltd allots IPO shares; rejects 3,674 applications [250609]
  
“Drilling Commences for Mugu Karnali Hydropower Project” [250609]
  
Export of 40 MW Electricity in Doubt as Bangladesh Delays LC Opening [250609]
  
'Take and Pay’ will have no impact on the power purchase agreement: FM [250608]
  
Govt shuts down Udayapur Cement and Triyuga River Management Office, locals outraged [250608]
  
Solar power production in Kalikot [250607]
  
Public Accounts Committee Halts Jagdulla Contract Pending Clarity [250607]
  
Hydropower Dominates Weekly Stock Trading with 50% Share [250607]
  
Gandak Canal fully operational, irrigation area expands fivefold: Lawmaker Chaudhary [250607]
  
Experts criticize budget 2025/26 for failing to address economic challenges [250607]
  
Investment Board Nepal Approves Cable Car, Hydropower, and Other Projects [250606]
  
EV charging station comes into operation in Kathmandu [250606]
  
Him Star Urja Company to issue IPO for project-affected local and overseas Nepalis [250606]
  
Nepal’s ethanol blending plan stuck for 20 yrs despite billions in savings [250606]
  
‘Take and Pay’ policy threatens 17,000 MW hydropower projects, Finance Ministry steps in to address crisis [250605]
  
Budget Jolt: ‘Take-and-Pay’ Policy Rattles Nepal’s Energy Investors [250605]
  
NEPSE Ends Lower as Hydropower Stocks Attract Investors [250605]
  
Geppert Group Strengthens Commitment to Nepal’s Sustainable Hydropower Future [250605]
  
Nepal imports petroleum worth over Rs 16 billion through Kakarbhitta [250605]
  
Construction of arch bridge begins over Modi River on Mid-Hill Highway [250605]
  
IPAN Urges Government to Scrap ‘Take and Pay’ Policy in PPA, Energy Minister Khadka Expresses Concerns [250604]
  
Budhiganga Hydropower Project Left Out of Government Priorities [250604]
  
Uruguay envoy calls on Minister Khadka [250604]
  
Sunkoshi Marin Diversion Multipurpose Project’s 13.2 km tunnel completes [250604]
  
Jordan to host Nepali business delegation to explore trade and investment opportunities [250604]
  
Budget came to encourage the private sector, implementation did not fail: Chandra Dhakal [250603]
  
A Development Revolution in the Village Through Hydropower [250603]
  
Birgunj Booms: Imports cross Rs 500 billion mark [250603]
  
Nepal, Zimbabwe urged to boost private sector ties for shared prosperity [250603]
  
Sindhulli's junar farmers in long wait for revival of cold store, industry [250603]
  
PPMO blacklists two foreign, one Nepali construction firms [250603]
  
DoR constructs over 36,000 kilometers of roads across Nepal so far [250603]
  
Govt allocates Rs 8.5 billion for MCC project [250603]
  
Energy Sector Faces Crisis After Budget Declaration, Warns IPPAN [250602]
  
81% progress under civil works found in Rahughat hydro [250602]
  
World Bank Approves $257 Million to Improve Electricity and Irrigation Services [250602]
  
Construction of dry port gains pace in Dodhara Chandani [250602]
  
Hitendra Dev Shakya Highlights Pumped Storage as the Future of Energy [250601]
  
Four-wheeler imports through Birgunj decline [250601]
  
NOC hikes petrol and diesel prices [250531]
  
Transmission Line in Karnali to Be Completed Within Two Years [250530]
  
NEA reports Rs 10.52 billion profit, contradicting earlier claim of Rs 5.26 billion loss [250530]
  
Govt aims to generate additional 942 MW power with Rs 8.06 billion budget for energy, irrigation [250530]
  
Govt allocates Rs 105 billion for infrastructure, proposes podway as alternative to Kathmandu-Hetauda ropeway [250530]
  
Jagdulla Project Under Scrutiny Following Issuance of Letter of Intent [250529]
  
Nepal’s Road and Water Infrastructure See Significant Progress in 2081/82 [250529]
  
Nepal Introduces Time-Based Electricity Tariffs, Allocates NPR 86.01 Billion for Energy Sector [250529]
  
Nepal grants tax relief for IT, Tourism, and Green Energy Industries in 2025-26 Budget [250529]
  
US Ambassador calls on Energy Minister Khadka [250529]
  
Siliguri-Charali international petroleum pipeline to be constructed [250529]
  
Nepal’s electricity production capacity reaches 3,602 MW [250529]
  
Petroleum exploration to begin in Palpa, Sunsari and Dang [250529]
  
Govt allocates Rs 2.6 billion to complete Nagdhunga and Siddhababa tunnel roads [250529]
  
Terai-Madhesh Expressway to be completed by FY 2027/28 [250529]
  
Govt to divest 30% shares of Nepal Telecom to public [250529]
  
Govt defies rumours, keeps taxes on EVs unchanged [250529]
  
Nepal urges continuation of US-halted MCC project [250529]
  
Govt imposes only 1% customs duty on equipment for ev charging station, waives other taxes [250529]
  
Three new tunnel roads to be built next FY [250529]
  
Mid-Hill Highway crumbles just four years after construction [250529]
  
Powering Progress: 80% of Sankhuwasabha Households Now Electrified [250528]
  
Nepal still awaits chemical fertilizer factory after four decades of delay [250528]
  
Energy Minister Assures Parliament Will Approve Electricity Bill Soon at IPPAN Event [250527]
  
Minister Khadka: Electricity Bill Key to Meeting Energy Goals [250527]
  
Electricity Import-Export Rate Not Sanctioned by Nepal Electricity Authority’s Key Bodies [250527]
  
Shakya: Nepal Exports Power to India at INR 4/unit After 9 PM [250527]
  
No Load-Shedding Will Be Allowed, Assures Minister Khadka After No-Light Branch Inspection [250526]
  
Govt sets ambitious target to raise EV share to 95% by 2035 [250526]
  
Chamber Encourages Sri Lankan Businesses to Invest in Nepal [250525]
  
EV imports surge, nearly 10,000 four-wheeler EVs imported in 10 months [250525]
  
Three-Day Deadline Set by Minister Khadka for File Clearance [250525]
  
Traffic jams at Gwarko will soon be thing of past [250525]
  
Energy Minister directs subordinate bodies to ensure prompt service delivery [250525]
  
Process to build Kaligandaki hydel project begins [250524]
  
NEA MD Shakya commits to reliable, affordable electricity in Koshi [250524]
  
SJVN to Export 200 MW Hydropower from Nepal to DVC [250523]
  
Nepal Infrastructure Bank to issue NPR 5 billion green energy bonds [250523]
  
NTA directs 73 ISPs to clear outstanding dues within 15 days [250523]
  
Rs 3 billion wasted on railway expansion schemes [250523]
  
Sanvi Energy Ltd IPO opens for general public starting today [250523]
  
NADA team presents five-point plan to governor Paudel [250523]
  
The Role of Energy Sector Development in National Economic Prosperity [250522]
  
NEA Resumes Power Exports to India Amid Domestic Production Boom [250522]
  
Negligible progress in Tukucha River cleanup as deadline nears [250522]
  
Petroleum imports rise by 7.5 percent, revenue hits Rs 92.51 billion [250522]
  
MoU Signed to Develop Flood Early Warning System for Hydropower Projects [250521]
  
Government Committed to Tamor Multipurpose Project: Energy Minister [250521]
  
Salyan’s Electrification Plan Remains Incomplete [250521]
  
Bridge constructed over Bhuteni rivulet at Haldibari of Jhapa [250521]
  
Power generation halted in Iwa Khola Hydropower Project [250521]
  
Bridge constructed at Jhedi in Gulmi's Musikot Municipality [250521]
  
EV charging stations reach 750 as demand grows [250521]
  
Proton e.MAS7 now more affordable with Jagdamba’s instant financing [250521]
  
Under Shri R. K. Singh’s Leadership, Power Ministry CPSE Clinches Key Project [250520]
  
Bikash Hydropower opens IPO for project-affected local and overseas Nepalis [250520]
  
Mid-Hill Highway: Harichowk-Yamdi section paved using ‘asphalt’ technology [250520]
  
SEBON cancels IPOs of 14 companies with low net worth [250520]
  
MCC spending plummets to 14.2% after grant halt [250520]
  
Final Day to Secure Rights Shares of Rapti Hydro [250519]
  
96 irrigation projects completed in Kavre, 157 in progress [250519]
  
Nepal Telecom’s profit drops by 48.6 percent in first nine months of current FY [250519]
  
Over 1,200 EVs imported via Tatopani customs in one month [250519]
  
Sagarmatha Sambaad: Stakeholders Unite to Boost Clean Energy Production [250518]
  
Electricity Shortages Cut Production Capacity in Morang and Birgunj by 50% [250518]
  
Why are EV piling up at Nepal’s customs? Traders face policy uncertainty [250518]
  
ADB VP Fatima Yasmin concludes Nepal visit, Pledges support for climate-resilient infrastructure [250518]
  
OAG points out major financial irregularities by firms during IPO approval process [250518]
  
Patan High Court Rejects Interim Order for Siu and High Himalaya in Jagdulla Project [250517]
  
Everest Region Draws Tourists but Lacks Reliable Electricity [250517]
  
76.5% work on Babai irrigation project completes [250517]
  
Contractor asked to complete diversion work before monsoon [250517]
  
Melamchi water distribution expanded in Balaju, Nagarjun [250517]
  
Azerbaijan urged to invest in Nepal’s hydropower sector [250517]
  
Nepal’s Untapped Solar Energy Potential [250516]
  
Electric Wire Undergrounding Stalls Despite Repeated Deadline Extensions [250516]
  
Environment Minister Yadav Meets Nepal PM to Discuss Clean Energy and Biodiversity [250516]
  
Morang Chamber demands regular power supply [250516]
  
People's Power gets nod to issue 50 percent right shares [250516]
  
Over 600 EVs imported via Rasuwagadhi in a month, 2,000 more awaiting clearance [250516]
  
NEA to Sign PPAs for Hydropower Projects Above 10 Megawatts [250515]
  
Kumari Bank Leads NPR 15 Billion Investment in 90 MW Marsyangdi Hydropower Project [250515]
  
Corruption alleged in TERAMOCS purchase, case filed against former minister Mohan Bahadur Basnet and 16 others [250515]
  
Kulekhani maintenance work completes [250515]
  
Telecom, Ncell must pay a 15% penalty for late license renewal fees [250515]
  
Nepal Invites French Investment in Expanding Hydropower Sector [250514]
  
PM Oli and Korea Railroad Corporation Chair hold meeting [250514]
  
Uncertainty looms over Phosphorite mining [250514]
  
NEA offers olive branch to defaulting industries [250514]
  
Upper Tamakoshi’s losses reach Rs 12.18 billion [250514]
  
NEA opens PPA process for 54 hydropower projects [250514]
  
Korean railway giant presents Everest Railway project proposal to PM Oli [250514]
  
Government to Begin Reconstruction in Melamchi and Helambu: Energy Minister Khadka [250513]
  
Brahmayani Hydropower Project Kicks Off with Tunnel Construction [250513]
  
CA Yunus Urges Economic Integration, Hydropower Partnership with Nepal [250513]
  
Electricity Development Department Seeks Letters of Intent for 365 MW BOT Model Projects [250513]
  
HoR session: MPs call for mobilizing budget on projects yielding maximum results [250513]
  
Private sector urges govt to conduct quarterly assessment of development expenditure [250513]
  
Industries using dedicated feeders, trunk lines have until mid-June for tariff review [250513]
  
Consortium to fund 42 MW Lapche Tamakoshi Hydel Project [250513]
  
Steel and Sustainability: Nepal’s Path to Greener Production [250512]
  
Energy, aviation and ICT infrastructure to get priority in new budget [250512]
  
Weekly Share Trading: Hydropower Sub-Group Commands 63.5% Market Share [250511]
  
FNCCI President Dhakal urges businessmen to invest in Nepal [250511]
  
Investment Secured for Bajra Madi Hydropower Project with 24.8 MW Generation Capacity [250510]
  
Huawei strengthens commitment to Nepal’s digital talent with ‘Seeds for the Future 2025’ initiative [250510]
  
Seti River Hydropower construction completes [250510]
  
Technical Challenges in Connecting Rahughat Basin Hydropower to National Grid [250509]
  
IREDA’s Investment Rejected, GMR Plans Changes in Shareholding Structure [250509]
  
FNCCI president Dhakal invites Indian investors for investment [250509]
  
No more power cuts, NEA to initiate DDA soon: Minister Khadka [250509]
  
Beyond Hydropower: Unlocking Nepal’s Geothermal Potential [250508]
  
Minister Khadka Calls on Commission to Settle ToD Meter Issue [250508]
  
SEBON Accused of Dodging Allegations as IPO Halt Enters 20th Month [250508]
  
Jiangxi and ANK JV Take Over Disputed Jagdulla Hydropower Contract [250508]
  
uropean investors’ mission explores investment potential in Nepal [250508]
  
Udayapur Cement produces Rs 550 million worth of cement in a week despite power disruptions [250508]
  
High Court Issues Show-Cause Notice Over Jagdulla Hydel Tender [250507]
  
Japan commits $18.5 million to rebuild flood-damaged BP Highway in Nepal [250507]
  
NEBON faces allegations of bribery in hydropower IPO approvals [250507]
  
Minister Khadka directs to resolve transmission line dispute [250507]
  
No new road projects in upcoming budget [250507]
  
MoWS, Karnali Water Ministry sign cost-sharing agreement [250507]
  
Energy Minister Orders Immediate Action on Kohalpur–Surkhet Transmission Line Dispute [250506]
  
NEPSE Rebounds Slightly as Daily Turnover Hits Rs 8.74 Billion, Hydropower Stocks Lead [250506]
  
NEPSE sees slight recovery, daily turnover soars to Rs 8.74 billion as hydropower dominates investor interest [250506]
  
NTA orders immediate halt to illegal use of ‘Starlink’ internet in Nepal’s Himalayan region [250506]
  
Melamchi water distribution network to expand outside Kathmandu’s Ring Road [250506]
  
Govt close to finalizing modality to fund 10,800 MW Karnali-Chisapani Multipurpose Project [250506]
  
A Vision for Energy Transformation: Achieving 28,500 Megawatts in 10 Years [250505]
  
State Minister Garbuja assumes office [250505]
  
Koshi govt to set up Rs 26 billion green hydrogen fertilizer plant [250505]
  
Expansion of Petroleum Infrastructure in Nepal: Pipeline Construction Progressing in Jhapa and Chitwan [250504]
  
Investment commitment of Rs. 152 billion in 46 projects in Koshi [250504]
  
Thulo Khola Hydroelectric Project (21.3 MW) nears completion [250504]
  
Koshi Province Investment Summit: MoUs signed for investments worth 152 billion [250504]
  
Mobilizing Domestic Capital for Hydropower Development [250503]
  
Upper Thulokhola Hydropower Project Nears Completion: Final Stage of Construction [250503]
  
11 projects to start operations, 14 to enter construction [250503]
  
NEA claims Rs. 5.26 billion loss [250503]
  
Cash-rich on paper, broke in reality: NEA seeks Rs 10 billion loan amid zero liquidity [250503]
  
Nepal’s Sudurpaschim Province CM Heads Delegation Visit to NHPC Headquarters [250502]
  
Hydropower Sector Leads Market Gains; Micro Insurance Companies Shine [250502]
  
Domestic capital for hydropower projects [250502]
  
Urgency of infrastructures for thriving ICT: Minister Gurung [250502]
  
NEA white paper released: 84.62 percent of Nepali households have electricity access [250502]
  
NEA’s total assets reach Rs 644 billion [250502]
  
India consents to increase electricity supply and duration to export to Nepal [250502]
  
Chimkhola–Mangale–Rahughat Hydropower Project Ready for Test Production [250501]
  
Indian govt agrees to supply additional 600 MW electricity to Nepal [250501]
  
NOC slashes petroleum prices [250501]
  
UK’s BII Joins IFC and MetLife in First Local Currency Green Bond by NMB Bank [250430]
  
Preparations over for Koshi Province Investment Summit [250430]
  
Nepal receives foreign aid commitment of over Rs 225 billion in first eight months of current FY [250430]
  
Bikash Hydropower gets SEBON nod to issue IPO [250430]
  
Hydropower firms with poor finances ‘lure’ public investors amid regulatory gaps [250430]
  
Cultural and Environmental Resistance Halts Upper Tamor Hydropower Project [250429]
  
Focus on power production and exports: Rana advises government [250429]
  
NRB makes hire purchase companies mandatory to finance only up to 60 percent on EVs [250429]
  
NEA postpones release of white paper [250429]
  
NEA confirms NPR 46.47 billion profit, validates Kulman Ghising’s claims [250428]
  
Pokhara-Mugling road expansion nears completion [250428]
  
Govt to establish financial fund of Rs 100 billion for infrastructure development [250428]
  
Weekly Share Turnover Reaches 41 Billion; Hydropower Accounts for 49% [250427]
  
Authority: 15-20 Days Required to Meet Power Demand in Industrial Sector [250427]
  
Minister Khadka Urges Inclusive Budget Allocation for All Regions [250427]
  
Relekhola Hydropower Project to start production by mid-May [250427]
  
East-West Highway upgrade works make no momentum in Sarlahi, Dhanusha [250427]
  
Manufacturers again hike prices of cement and iron rods [250427]
  
Ministry of Energy, MCA Nepal returns over Rs 5 billion in budget amid project delays and uncertainty [250427]
  
125 hydroelectric projects owe over Rs 245 million [250427]
  
GMR Recommended to Manage Finances for Upper Karnali Project [250426]
  
NOC mulling over dual price on cooking gas again [250426]
  
MCC’s uncertain future sparks debate on Nepal’s infrastructure ambitions and cost concerns [250425]
  
NEA imposes partial load-shedding in industries [250425]
  
Nepal to advance MCC projects — with or without grant support [250425]
  
Nepal Struggles to Import Power from India as Summer Demand Soars [250424]
  
Electricity Production Suspended at Gandak Hydropower Project for Canal Maintenance [250424]
  
US decides to shut down MCC, impacting Nepal’s infrastructure projects [250424]
  
No progress to generate 1,000 MW electricity [250424]
  
IPO allotment of Pure Energy concludes, 1.727 million applicants left empty-handed [250424]
  
MCA-Nepal starts construction of 400 kV Damauli substation [250423]
  
Nepal, India reach agreement to expand cross-border transmission lines [250423]
  
NEA faces leadership crisis as new managing director faces criticism [250422]
  
Indian Power Minister Khattar Inspects Arun-III Project, Inauguration Of Koshi Corridor Postponed [250422]
  
Indian Power Minister Khattar arrives [250422]
  
Marsyangdi Hydropower Project affected families recieve compensation [250422]
  
Nepal Electricity Authority cancels contract worth over Rs 1 billion, now electricity wires going to customers' homes are bare [250421]
  
Indian Power Minister Khattar to visit Nepal at invitation of Energy Minister Khadka [250421]
  
Hydropower Shares Attract Strong Interest, Nearly NPR 8 Billion Traded in a Week [250420]
  
Nepal imports EVs worth Rs 20 billion in first nine months of current FY [250420]
  
Nepal imports electric vehicles worth over 7 billion from China [250419]
  
FNCCI Prez urges migrant workers to invest in Nepal [250419]
  
MD Shakya Conducts Inspection of Fire-affected Dhalkebar Substation [250418]
  
Sanvi Energy Limited IPO opens for project-affected local and overseas Nepalis [250418]
  
Think-tank summit discusses Nepal-India bilateral trade and economic relations [250418]
  
JA Solar Hosts Landmark Summit in Nepal to Advance South Asia’s Solar Future [250417]
  
PPMO blacklists four construction companies and suppliers [250417]
  
IPPAN demands removal of minimum charge provision in hydropower insurance [250416]
  
Fire Erupts at Dhalkebar Substation, Triggers Power Outage in Three Districts [250416]
  
Koshi Province prepared for Investment Summit [250416]
  
Draft of Joint Venture Agreement for Cross-Border Transmission Line in Progress [250415]
  
Investment in Tourism and Hydropower a Priority: President Dhakal [250415]
  
Price of petroleum products drop [250415]
  
Pure Energy's IPO oversubscribed by 16 times [250415]
  
NEA dismisses load-shedding rumors, cites weather as cause of outages [250415]
  
Nepal receives FDI commitment worth Rs 57.97 billion in nine months of current FY [250415]
  
Compensation for BGHP affected locals determined [250415]
  
Birgunj Industrialists Call for End to Undeclared Load-Shedding [250414]
  
Fire at Matatirtha Substation Causes Outage, Valley Power Restored Through Alternatives [250414]
  
Two electric rotors installed in Tanahun Hydropower powerhouse [250413]
  
Unitech Hydropower to issue IPO [250413]
  
IPPAN draws Prime Minister's attention after 20-month halt [250413]
  
IPPAN, PLA to study 'Green Taxonomy' [250412]
  
NEA Board approves up to Rs 1 million in relief for electrical accident victims [250412]
  
NOC earns Rs 9.55 billion profit [250412]
  
NOC pays Rs 112 billion in tax from fuel transactions [250412]
  
NEA MD Shakya holds talks with industrialists to recover dues on dedicated, trunk lines [250412]
  
Energy Minister Directs Officials to Resolve Pending Line Dues [250410]
  
Budget 2025: Private Sector Calls for Focus on Infrastructure and Hydropower [250410]
  
China-Built Hydropower Plant Officially Begins Operation in Nepal [250410]
  
‘Country will not experience load shedding’ [250410]
  
Pure Energy Limited launches IPO for general public [250410]
  
Germany's Charge d' Affaires calls on Energy Minister Khadka [250410]
  
Electrifying SUV Game: MG introduces all-new S5 EV in Butwal & Bhairahawa [250409]
  
Nepal’s Economy Will Likely To Grow By 4.4 In Fiscal Year 2025: ADB [250409]
  
NEA Myagdi Completes Electrification of Punhill [250409]
  
Nepal at risk of becoming EV dumping ground, experts warn [250409]
  
Beni-Arthunge-Toripani-Pakha Pani road completed [250409]
  
Sanvi Energy set to issue IPO from April 8 [250409]
  
Vision Lumbini Urja Awarded International ISO Certification for Excellence [250407]
  
Byas Municipality operates cold storage [250406]
  
Nagdhunga Tunnel Construction Stalled for 22 Days Due to Local Obstructions [250406]
  
International Fire Risk and Electrical Safety Conference Kicks Off in Kathmandu with Experts from 14 Countries [250406]
  
Gham Power to Launch Nepal’s Largest Battery Storage Project [250405]
  
Kulman Ghising Bids Farewell to NEA: A Legacy of Electrification, Expansion, and National Service [250404]
  
Strengthening Nepal-Thailand Relations: Focus on Tourism and Energy [250404]
  
Nepal and Thailand to form Joint Business Council [250404]
  
Nepal's Economy Expected to Remain Resilient in Face of Economic Shocks, says World Bank [250403]
  
Russian Envoy Meets Energy Minister to Discuss Bilateral Cooperation [250403]
  
Six districts of Lumbini to be declared a ‘Fully Electrified Zone’ [250402]
  
CNI, Thai FTI sign MoU for investment promotion [250402]
  
Shrestha appointed as CEO of Rastriya Prasaran Grid Company [250401]
  
Cimex Inc honored with prestigious awards at BYD Asia Pacific 2025 Dealer Conference [250401]
  
FNEA commends NEA, govt leaders for addressing load shedding [250401]
  
Load shedding in industries limited to five hours [250401]
  
Boost in Indian Power Supply Revives Nepal’s Struggling Manufacturers [250331]
  
Upper Trishuli-1 Donates Two Ambulances to Rural Municipalities in Support of Local Healthcare [250331]
  
Pure Energy Limited to issue IPO for general public from April 10 [250331]
  
Improved electricity supply from India gives lifeline to ailing Nepali manufacturers [250331]
  
Sluggish progress in Bajura-Mugu Karnali bridge construction [250330]
  
World Bank approves financing package $150m to Nepal [250330]
  
Further Delays Hit Bheri Babai Irrigation and Hydropower Project [250329]
  
Ministries fail to utilize capital budget effectively [250329]
  
Hydel project provides skills generating training to affected communities [250328]
  
India approves 600 MW additional power for Nepal to ease electricity shortage [250328]
  
BYD to showcase its EV line-up at WADA Auto Show 2025 [250327]
  
NEA spokesperson removed, Rajabhai appointed as new spokesperson [250327]
  
Indian investors urged to invest in Nepal’s hydropower sector [250327]
  
NEA opens PPA for 5,000 MW hydro projects just a day after Ghising’s dismissal [250327]
  
Newly-appointed NEA Chief Shakya moves to SC over service benefits [250327]
  
Shakya Pledges to Prevent Load Shedding in Industries, Even If It Means Importing More Electricity from India [250326]
  
Nepal imports petroleum worth Rs 12.64 billion through Kakarbhitta [250326]
  
Govt announces 50% discount on electricity for low-income households [250326]
  
Kul Man Ghising prepares to challenge removal in court after govt sacks him from NEA [250326]
  
Govt gives 10 reasons for Ghising’s removal [250326]
  
Hyundai Nepal launches CRETA EV & CRETA ICE [250325]
  
Nepal’s 1st 100% pure EV pickup launches today with 4×4 adventure drive experience [250325]
  
Kul Man Ghising’s removal puts Oli-led government in a tight spot [250325]
  
Nepal Electricity Authority Managing Director Shakya takes Charge [250325]
  
Construction of three substations in final stage to improve power supply in Birgunj area [250325]
  
Load shedding cuts industrial production by over 50 percent [250325]
  
Sanvi Energy to issue IPO worth 379 million [250325]
  
AmCham Nepal strengthens commercial ties in Washington, DC [250324]
  
India reduce electricity supply to Nepal, triggering power crisis in dry season [250324]
  
Nepal has achieved remarkable success in poverty reduction: World Bank [250324]
  
Govt sacks NEA Executive Director Kulman Ghising, Shakya appointed new ED [250324]
  
Industries Struggle as Load Shedding Reaches 12 Hours a Day [250324]
  
Petroleum products worth Rs 122 billion imported from Birgunj [250324]
  
Nepal sees surge in hybrid and EV imports in first eight months of FY 2024-25 [250323]
  
FNCCI President Warns Against Discouraging Private Sector, Highlights Need for Policy Stability [250323]
  
Pancheshwar developing DPR to draw Mahakali River water [250323]
  
Kulekhani operates 24 hours a day after reduced electricity imports from India [250322]
  
EVs boom fails to curb Nepal’s import of petrol and diesel [250322]
  
Dhalkebar-Bara transmission line construction completed [250322]
  
Trump administration’s green light signals resumption of MCC projects in Nepal [250322]
  
47 kms blacktopped along eastern section of Narayanghat-Butwal road [250321]
  
Business bodies urge govt to address power cut problems [250321]
  
Nepal imports EVs worth Rs 16.65 billion [250321]
  
Laxmi Steel, Sarbottam Cement pay installments of outstanding arrears [250321]
  
Kulman Ghising reassures no load-shedding for households, contradicts energy minister’s claims [250320]
  
Nepal asks India for 230 MW electricity to tackle power shortage [250320]
  
Loan agreement signed for 8MW Tadi hydropower [250320]
  
Govt looks forward to expedite MCC projects on its own [250320]
  
Nepal’s automotive industry fractures as NADA faces bold challenge from breakaway NAIMA [250319]
  
Load Shedding Begins in Industries! What Are the Authority’s Preparations? [250319]
  
‘Koseli Ghar’ to manage waste [250319]
  
Energy Minister announces evening load shedding [250319]
  
Upper Rawakhola power plant resumes operation after deal to provide compensation [250319]
  
85 percent work completed on Beni-Jomsom-Korala section of Kaligandaki Corridor [250319]
  
Tank containers carrying raw oil arrive in Birgunj Dry Port [250319]
  
BYD advances sustainability with cutting-edge battery recycling on Global Recycling Day [250318]
  
Locals Halt Rawakhola Power Generation Over Unpaid Land Compensation [250318]
  
Minister Khadka expresses commitment to managing budget for conservation of glaciers [250317]
  
Four Companies Bid for 106 MW Jagdulla Hydropower Project Contract [250317]
  
Five hydroelectric projects agree to meet local demands [250317]
  
Nepal to avoid load-shedding despite India’s power supply restrictions [250316]
  
NEA urges completion of Middle Bhotekoshi and Khimti-Barhabise line in one month [250316]
  
Reduced water flow cuts Marsyangdi hydropower output [250316]
  
Is it possible to add 25,000 MW power in a decade? [250316]
  
NEA announces power cuts in several areas today [250315]
  
Kaligandaki Corridor becomes boon for locals [250315]
  
NOC slashes prices of petroleum products [250315]
  
Nepal to faces power crisis as India slashes electricity supply [250314]
  
NEA Granted Permission to Import Electricity from India for Just 12 Hours a Day Starting Sunday [250314]
  
Stock of the Week: Hydropower Leads as Financial and Insurance Sectors Decline [250314]
  
Nagdhunga tunnel 87% complete, Vehicle access expected within a year [250314]
  
NOC begins petrol imports from India via pipeline [250314]
  
Reconstruction of Mandu Hydropower in Final Phase [250313]
  
Contract worth over Rs 4 billion announced for Karnali Corridor construction [250313]
  
Plans for connecting China through Korala road in progress [250313]
  
3.26 million Nepalis still using 2G network [250312]
  
Nepal’s telecom sector in crisis, experts and stakeholders demand urgent reforms [250312]
  
Govt calls tender for BP Highway reconstruction [250312]
  
EU Envoy Lorenzo Pays Courtesy Call on Minister Khadka [250312]
  
Energy Minister stresses speedy project work [250312]
  
Registration for NADA Auto Show 2025 opens today [250311]
  
Huawei and CNI push Nepal toward green energy at solar PV & energy storage dialogue [250311]
  
Arun Hydropower Project Must Be Completed Quickly for National Benefit: Energy Minister [250311]
  
Pokhara-Mugling road (Western Section) achieves 43% physical progress [250311]
  
Raghuganga folks put forth 31-point demand before hydropower projects [250311]
  
283 MW Upper Tamor Project to Use TBM Machines for Excavation [250310]
  
IREDA Shares Fall as RBI Rejects Equity Investment in Nepal Hydro Project [250310]
  
All-party meeting reaches 7-point agreement on Upper Tamor Project operations [250310]
  
US Suspesion Of Grant: Impact On Nepal [250310]
  
MD Ghising: Target Of Personal Grudge [250309]
  
NEA MD Kulman Ghising Submits Sixth Clarification In Five Months, Accuses Energy Minister Khadka of Bias [250309]
  
Kabeli-3 Hydropower Project to Begin Production by Mid-March [250309]
  
Industrialists should pay electricity dues: Minister Khadka [250309]
  
Installing power transmission poles in full swing in Butwal [250308]
  
Kaligandaki Gorge Hydropower secures Rs 29.5 billion investment [250308]
  
Rahughat Hydropower Dam at risk of landslides, Study underway for prevention [250308]
  
MG Introduces the all-new S5 EV in Nepal [250307]
  
Laxmi Sunrise led consortium signs facilities agreement with Kaligandaki Gorge Hydropower to finance 180 MW Project [250307]
  
Ring Road expansion to begin soon: Minister Dahal [250307]
  
NEA employees divided over Minister Khadka's controversial remarks [250307]
  
Monopole installation underway on Yogikuti-Horizon chowk road in Butwal [250307]
  
Kulman Ghsing has Been Asked To Explanation Fight Time, Why Should Not He Removed? [250307]
  
NEA honours municipalities clearing street light dues [250307]
  
Bridge connecting provincial capital not built even in eight years [250306]
  
Mid-Kaligandaki project construction begins [250306]
  
NEA MD Ghising inaugurates 33 kV double circuit line in Kapilvastu [250306]
  
Government seeks clarification from NEA managing director Kul Man Ghising [250306]
  
AmCham Nepal hosts training series with ADB and World Bank to boost economic growth and investment [250306]
  
BYD extends warranty on EV models, enhances customer benefits in Nepal [250305]
  
Speaker orders government to explain Kul Man Ghising’s zero performance score [250305]
  
Nepal Telecommunication Authority faces harsh criticism over poor capital expenditure and regulatory weakness [250305]
  
Upper Rahughat Hydropower Project Nears Completion, Set to Generate 48.5 MW by July 2025 [250305]
  
Commission increased on gas, no burden on consumers: Nepal Oil Corporation [250305]
  
LPG bottlers call off strike after govt agrees to raise overhead compensation [250305]
  
Melamchi Drinking Water pipe bursts at Thapathali, vicinity waterlogged [250304]
  
Govt, industrialists agree to hike rate of LP gas by Rs 12 per cylinder [250304]
  
NLPGA calls off strike, consented on five-point agreement with govt [250304]
  
Pure Energy Limited opens IPO [250304]
  
Upper Rahughat construction reaches final stage [250304]
  
BYD Hi-Tech marks global milestone with delivery of 1,000,000th BYD ATTO 3 [250303]
  
Government assigns zero rating to NEA Managing Director Kulman Ghising’s performance evaluation [250303]
  
NEA to promote pump storage projects [250303]
  
Construction of access road to Upper Arun Hydropower project begins [250303]
  
Electricity Bill Stalled in Parliamentary Committee for 18 Months [250302]
  
FinMin allocates two billion for permanent bridge construction following flood damage [250302]
  
Six substations under construction in Kathmandu Valley to boost electricity supply [250301]
  
NOC cuts diesel & kerosene prices by one rupee [250301]
  
Nepal Electricity Authority earns Rs 11.36 billion profit in six months [250228]
  
Power outage in areas Maharajgunj Distribution Center today [250228]
  
BYD Hi-Tech Week inaugurated in Nepal, showcasing next-gen mobility innovations [250227]
  
NADA urges NRB to retain 80% loan-to-value ratio for EVs [250227]
  
Ghising says ministry cannot remove him from service [250227]
  
Equal Access to Clean Energy: A Shared Responsibility for a Sustainable Future [250227]
  
Alternative route for Mugling-Narayanghat road under construction [250227]
  
Super Kabeli to begin power generation [250227]
  
Reliance brings 9.2 MW solar plant into operation [250227]
  
Eleven hydropower projects are being constructed in three rivers of Myagdi, with a capacity of 390 megawatts of electricity [250226]
  
Progress of Sunkoshi Marine Diversion Multipurpose Project dam construction sluggish [250226]
  
Import figures show domestic consumption growth despite economic slowdown concerns [250226]
  
Karnali’s 132 kV Transmission Line Expansion Stalled by Three Towers [250226]
  
NRB tightens EV loan provision, eases financing for fossil-fuel powered vehicles [250226]
  
Energy Minister Khadka seeks clarification from NEA MD Ghising [250225]
  
Genese Solution organises interaction on GenAI, cybersecurity, and customer engagement in Kathmandu [250225]
  
Seven USAID Programs Halted In Nepal: Ministry of Finance [250225]
  
West Seti Transmission Line Construction in Jeopardy Amid Investment Issue [250225]
  
Rs. 27 billion FDI received in first seven months of current fiscal [250225]
  
Nepal imports petroleum products worth over Rs 100 billion [250225]
  
BYD Hi-Tech Week 2025: A groundbreaking immersive experience in EV innovation [250224]
  
37 MW Upper Myagdi Hydropower Project construction begins [250224]
  
ADB Powering Nepal: Five Decades Of Support [250224]
  
Upper Trishuli-1 Hydropower: Supporting Community Development [250224]
  
Renewable and Green Energy: Challenges To Overcome [250223]
  
Nepal Electricity Authority (NEA) has once again received a 'Double A Plus' rating [250223]
  
FNCCI President Dhakal urges British investors to invest in Nepal [250223]
  
MD Ghising: Victim of Minister Khadka's Personal Vendetta [250223]
  
Greener Skies: Advancing Sustainable Aviation in Nepal with Battery-Powered Ground Handling [250223]
  
Bangladesh to Import 40MW Electricity from Nepal for Five Months [250223]
  
Haripurwa substation comes into operation [250223]
  
Deepal’s new state-of-the-art showroom in Pokhara [250222]
  
Japanese envoy calls on Minister Khadka [250222]
  
Three hydropower projects kick off in Myagdi's Mudi area [250222]
  
Foreign trade of Rs 1,115 billion records loss of Rs 861 billion [250222]
  
Construction of 400 kV Lapsiphedi substation in full swing [250221]
  
IPPAN writes to PAC urging to rectify IPO restrictions for hydropower companie [250221]
  
Nepal Buildcon Int'l Expo kicks off [250220]
  
Upper Hewakhola to raise Rs 500 million via right share to pay off debt [250220]
  
ERC tightens noose against hydropower developers trading shares illegally [250220]
  
Hyundai IONIQ 5 N TA spec sets fastest EV record at ‘Attack Tsukuba 2025’ [250219]
  
Proton e.MAS7 starts PAN Nepal Tour [250219]
  
Fate of MCC-funded projects hangs in balance as US suspends funding [250219]
  
Construction of Upper Myagdi-I Hydropower Project’s dam begins [250219]
  
UK Development Finance Institution Grants $15M Loan to Nepali Bank for Renewable Energy Expansion [250219]
  
Issuance of hydropower IPO emphasised [250219]
  
Solududhkunda demands for refuelling station at Phaplu [250219]
  
MCC project ‘temporarily’ suspended in Nepal [250219]
  
Electricity Regulatory Commission to Streamline Hydropower Regulation Process [250218]
  
Energy Minister Khadka: Investment Modality Set for Large Projects [250218]
  
Finance ministry allocates Rs 18.88 billion for reconstruction of 26 projects damaged by floods and landslides [250218]
  
Phedikhola Hydropower seeks to issue IPO [250218]
  
MCC project in Nepal suspended [250218]
  
Energy ministry streamlines procedures for $500 million solar energy projects [250217]
  
Government Revises Procedures to Boost Solar Energy Development [250217]
  
Upper Marsyangdi ‘A’ Hydropower Project Shuts Down for Maintenance [250217]
  
Three dozen bridges to be added on East-West highway [250217]
  
Minister Dr Rana calls on Japan for cooperation in restoring BP Highway [250217]
  
Regular import of fuel via pipelines expected to save leakage and transportation cost [250217]
  
NA unanimously passes Renewable Energy and Energy Efficiency Bill-2081 BS [250216]
  
Halesi Tuwachung prepares plan to advance energy access [250216]
  
NEA secures ‘Double A Plus’ credit rating for third consecutive year [250216]
  
Dordi Khola hydro to issue right shares [250216]
  
Trilateral power agreement is a milestone: Prachanda [250215]
  
Petrol price up by Rs 1, diesel and kerosene slashed by Rs 4 per liter [250215]
  
Concerns mount over Nepal’s proposed AI policy amid implementation gaps [250214]
  
Power supply to illegal crushers cut off [250214]
  
Government is dedicated to developing IT as main investment area: Industry Minister [250214]
  
Pancheshwar DPR: India assures yet again, Will this time be different? [250214]
  
Pure Energy secures SEBON approval for IPO issuance [250214]
  
Indian Ambassador, Energy Minister discuss power trade [250214]
  
Former President Bhandari honours CEO of Genese Solution for contributions to IT development [250213]
  
Upper Trishuli-1 HEP spends Rs. 170 million in affected areas through SSP [250213]
  
Nepal-India agree to finalize Pancheshwar DPR [250213]
  
LP Gas Industry Association calls off strike [250212]
  
Nepal-India reach agreement for construction of cross-border power transmission modality [250212]
  
IT-related goods and services worth Rs 28 billion exported in six months [250211]
  
990MW power to be linked to grid in Karnali [250211]
  
S.K. Energy Development appoints Sanima Capital as issue manager for IPO [250210]
  
Nepal-India finalizing cross-border power transmission modality [250210]
  
Orbit Energy appoints Kumari Capital as issue manager for IPO [250210]
  
Dhanushadham declared free from power pilferage [250210]
  
NOC mulls reintroducing differentiated LPG pricing planned a decade ago [250210]
  
Agricultural electrification abandoned, farmers’ land left dry [250209]
  
Minister Bhandari inspects Dhaubadi Iron Mine in Nawalparasi [250209]
  
Nepal and France launch HydroNepal Project to boost hydropower sector [250208]
  
Gulf Lubricants distributor Nepal Lube Oil holds successful retailer & mechanic meet in Western Nepal [250207]
  
Rastriya Banijya Bank to invest Rs 670 million in Super Machha Khola Hydropower Project [250207]
  
Government-private sector collaboration necessary for IT development-Dhakal [250206]
  
Morang landowners struggle as railway project keeps land frozen for five years [250206]
  
Hydropower shares record 32.5 percent turnover in first half of current FY [250206]
  
Lower Solukhola hydro project nears completion [250206]
  
Telecom providers face declining revenue, struggle to sustain capital investment [250205]
  
Physical progress of under-construction Nagdhunga tunnel project reaches 85pc [250205]
  
NEA and SJVN propose capacity expansion for Arun-4 Hydropower Project to 630MW [250205]
  
Lamsuwaghat bridge incomplete even in 14 years [250205]
  
Minister Khadka calls for timely completion of Rupa Tal Conservation Project [250205]
  
90% of Mid-Hill Highway section in Baglung completed, 13 km left to finish [250205]
  
‘inDrive ready to lead Nepal’s digital transformation, Nepal is our key market’ [250204]
  
Nepal Telecom should review its performance, Minister Gurung says [250204]
  
Water processing plant faces power supply problem [250204]
  
Govt to increase public shares in Nepal Telecom by threefold [250204]
  
Nepal Telecom to shut down 2G service by this year [250204]
  
Nepal Telecom announces free Wi-Fi service at 3 international and 31 domestic airports [250204]
  
Power regulatory body to allow private developers to set wheeling charges for electricity sales [250204]
  
3 private sector groups urge all not to vitiate investment environment [250203]
  
Nepal faces repeated internet blackouts as government delays foreign payments [250203]
  
Deal signed to involve hydropower in carbon trade [250203]
  
Modernization in agriculture necessary: Minister Gurung [250203]
  
Power cutoff in various parts of Kathmandu for eight days from today [250203]
  
43 hydropower companies' IPO approvals on hold pending regulatory amendments [250203]
  
Govt sets ambitious IT exports target [250202]
  
Economic slowdown hit import of petroleum products [250202]
  
Electricity from Kabeli to reach National Grid in 1.5 months [250202]
  
IPPAN signs MoU to acquire International Renewable Energy Certificates [250202]
  
CG Motors expands presence in Nepal with official launch of CG Brands in Birgunj [250201]
  
Energy Ministry and GIZ Partner for Renewable Energy and Efficiency Program [250201]
  
IPPAN Urges Finance Committee to Reevaluate PAC’s IPO Restriction on Low-Net-Worth Companies [250201]
  
Marsyangdi Hydropower Project Secures NPR 10.5 Billion Investment for Development [250201]
  
‘Small investment in IT sector can yield good results’ [250131]
  
Tanahun Hydropower: Affected get compensation [250131]
  
Fuel prices to increase from Friday midnight [250131]
  
NEA starts underground electricity supply in Pokhara [250131]
  
‘Information Technology Sector can generate more than Rs 100 billion annually’ [250130]
  
India Approves Upper Arun Hydropower Project, World Bank Poised to Invest [250130]
  
Trade & investment linkages between Nepal-Bangladesh discussed [250130]
  
Proton e.Mas7 EV to enter Nepali market fitted with aegis short blade battery & 12-in-1 electric drive system [250130]
  
Water flows to Akalgharuwa from Sikta Irrigation Project [250130]
  
US Capital Global Chairman Jeffrey Sweeney Tapped by Nepal Government to Spearhead Green Transportation Initiative [250129]
  
China's AI app DeepSeek rattles global AI industry [250129]
  
Tanahun Hydropower builds school under social development scheme [250129]
  
Laxmi Sunrise led Consortium signs facilities agreement with Ghunsa Khola Hydro-electric to finance 77.5 MW Project [250128]
  
USAID Nepal halts aid for four projects [250128]
  
Nepal’s Energy Sector: Facing Crisis [250128]
  
DeepSeek a 'wake-up call' for US tech firms, Trump says [250128]
  
Energy Minister Khadka Assures Stable Market, Encourages Confident Investment in Hydropower Sector [250128]
  
Energy Minister vows sustainable energy development with zero carbon emission [250128]
  
Proton to launch its EV in Nepali market [250127]
  
Uncertain Future of 20,000 MW Hydropower Projects in Protected Areas [250127]
  
MPs inspect irrigation canal, pledge to take steps to raise water flow [250127]
  
'Substation' construction gains momentum in Marchawar [250127]
  
BFIs to invest Rs 12.7B in Ghunsa Khola hydel project [250127]
  
US suspends all foreign aid: Implications for global development and Nepal [250126]
  
Ordinance will spur private sector growth [250126]
  
Postal Service to be rendered tech-savvy: Minister Gurung [250126]
  
SC decision to halt 20,000 MW of hydropower projects: IPPAN [250126]
  
Siddhababa Tunnel breakthrough expected to make road travel via Palpa safer [250125]
  
Khandbari-Kimathanka Road breakthrough on Monday [250125]
  
65 projects for drinking water, irrigation and river control in Myagdi [250125]
  
Gas vendor verification not done yet [250125]
  
Clean Energy, Bright Future: Nepal’s Green Hydrogen Opportunity [250124]
  
Jumla Glows with Power from Chukeni [250124]
  
Successful Completion of Underground Electrical Conduit Test in Bharatpur [250124]
  
Kaiyi X3 Pro EV now available with 99 kW Power [250123]
  
India’s largest solar company enters Nepal’s renewable energy sector [250123]
  
BYD Sealion 7 unveils at Bharat Mobility Global Expo 2025 [250123]
  
Ashok Leyland introduces LePower Genset in Nepal in collaboration with IME [250123]
  
Tanahun Hydropower Initiative: Resting Place for Vulture Conservation [250123]
  
37 billion revenue collection from petroleum products [250123]
  
India ready for capacity enhancement of cross-border transmission line [250123]
  
Petroleum products worth Rs 87.5 billion imported via Birgunj [250123]
  
Nepal Calls for Global Investment in Hydropower Development [250122]
  
Gandaki: The Future Hub of Hydroelectric Power [250122]
  
Nepal urges donors to invest in hydropower sector [250122]
  
PGE Summit 2025 held in Kathmandu [250122]
  
Neta secures $818.8 million investment, resumes production [250121]
  
Cimex Inc. Pvt. Ltd. announces nationwide ‘BYD Exchange Fest’ across 15 [250121]
  
Two roads connecting Makawanpur and Kathmandu come into operation [250121]
  
International Clean Energy Conference to Take Place in the Second Week of January [250121]
  
Nepal: Harnessing the Future as an AI Power Hub [250121]
  
Energy Discussions Continue at Nepal-India Deputy Secretary Level, No Secretary-Level Meeting Scheduled [250121]
  
EV excise duty collection up by 44 pc [250121]
  
Upper Tamakoshi Hydropower set to operate to full capacity, industrial areas still experiencing power cuts [250120]
  
Over 5,000 EVs imported in six months of current FY [250120]
  
Fresh tender issued for Jagadulla Hydropower Project [250120]
  
Waterwheels Revived: A Climate-Friendly Solution Making a Splash [250120]
  
From bribes to check distribution: Nepali Congress turns a blind eye as Minister Khadka’s alleged corruption [250119]
  
Upper Karnali Hydropower secures joint financing, paving way for construction [250119]
  
Experts call for transparency between govt and private sector for energy development [250119]
  
Chinese experts return with petroleum samples from Dailekh [250119]
  
NCC announces plans to facilitate investment in IT industry [250118]
  
Power supply to be disrupted in Lalitpur Valley today [250118]
  
Upper Tamakoshi Halts Production for 36 Hours [250118]
  
Nepal’s Hydropower Struggles: Energy Entrepreneurs Demand Urgent Reforms [250118]
  
Hydropower Scam Erupts: Minister Khadka faces backlash over controversial hydropower deals favoring Binod Chaudhary [250117]
  
PM Oli urges private sector to invest in energy, advocates self-reliance for mega projects [250117]
  
Not to worry about energy consumption, PM Oli reassures power producers [250117]
  
PM Assures: Iron Mines and Fertilizer Factories to Boost Energy Consumption [250117]
  
IREDA Finalizes Joint Venture for Hydropower Expansion in Nepal [250117]
  
President takes stock of Kathmandu Terai-Madhesh Fast Track [250117]
  
Nepal receives FDI commitment worth Rs 25.77 billion in six months [250117]
  
Neta Auto leads 2024 New Energy Vehicle rankings in Thailand [250116]
  
Energy Entrepreneurs Advocate for Dedicated IPO Framework for Hydropower Companies [250116]
  
Kulman Ghising Urges Increased Investment in Charging Stations [250116]
  
Govt allocates Rs 4 billion for Bheri Corridor upgradation [250116]
  
Kankai Bridge: Contract extended for five times, progress 'half' in 13 years [250116]
  
NOC to transfer Dhangadhi depot with an investment of Rs 3.5 billion [250116]
  
‘Melamchi water to reach people year-round’ [250116]
  
Price of fuel increased [250115]
  
NEA recovers Rs 228 million after disconnecting electricity of 19,000 customers [250115]
  
FCAN announces protests against govt over delay in payments [250115]
  
Industries no longer required to conduct EIA and IEE for capital increase [250115]
  
Star hotels recognized as industries, eligible for industry-like benefits, particularly for electricity consumption [250114]
  
Obstruction in the extension of the 33 kV line from Kamalbazar to Saikhola [250114]
  
Kulman Ghising challenges Energy Minister Khadka over dismissal attempt [250113]
  
Nepal, India forge stronger trade and transit cooperation in Kathmandu talks [250113]
  
Laxmi Sustainable Energy Fund holds first AGM [250113]
  
VUCL Bypasses Investment Board and Regulatory Commission in Hydropower Project Investments [250113]
  
Nepali IT companies granted permission for international expansion [250112]
  
Nepal-India Has Immense Potential For Cooperation In Business And Economic Sector: FNCCI President Dhakal [250112]
  
Manang Lights Up with National Transmission Line Connection [250112]
  
IPPAN Applauds Energy Roadmap, Seeks Policy Modernization [250111]
  
Over a dozen areas in Kathmandu to witness 4-hour power cut [250111]
  
NEA maintains steady profit for eight consecutive years as it limits leakage to 12.73% [250111]
  
Minister Bhandari emphasizes diversifying NOC's business [250110]
  
NIMB Achieves Accreditation With Green Climate Fund (GCF) [250110]
  
NEA MD Ghising submits performance details after energy ministry's clarification request: 98.99% Performance Score for 2023/24 [250110]
  
Roadmap to 28,500 MW: Feasibility of Meeting the 2035 Target [250110]
  
Energy secretary Suresh Acharya’s complicity in Minister Khadka’s controversial deals exposed [250109]
  
Ncell becomes first Nepali Telecom company to earn ISO 27001 & 27701 [250109]
  
Neta EV: Power, performance, and sustainability for Nepal’s EV market [250109]
  
The forgotten history of Nepal’s first hydropower project [250109]
  
400 Families to Receive Compensation for Arun 3 Hydropower Project [250109]
  
Dam Construction for Sunkoshi-Marin Faces Setbacks [250109]
  
Dipak Khadka Highlights Market Potential, Calls for Energy Sector Investments [250109]
  
Private sector urged to invest in energy sector [250108]
  
Banks to invest Rs 26 billion in two hydropower projects [250108]
  
Energy Minister Khadka faces allegations of corruption in Jagdulla Hydropower Project [250107]
  
AmCham Nepal event seeks to strengthen US-Nepal economic ties [250107]
  
MD Ghising's Unwavering Commitment From Darkness To Light [250107]
  
Energy Ministry seeks explanations from Ghising: Why not terminate your appointment? [250107]
  
Petroleum pipeline to be expanded from Amlekhgunj to Lothar in Chitwan [250107]
  
Laxmi Sunrise Bank to Lead Consortium in Financing 102 MW Upper Marsyangdi-1 Hydropower Project [250106]
  
Petroleum Exploration in Western Nepal: Analysis of Extracted Samples [250105]
  
Upper Arun Hydropower Project’s Environmental Impact Assessment Approved [250105]
  
Rs 6.5 trillion is required for 28,000 MW power generation: IPPAN Prez Karki [250104]
  
Declining profits spur Nepal Telecom to consider public share expansion [250103]
  
Private Sector Joins Hands for Lamabagar-Barhabise 220 kV Transmission Line [250103]
  
Nepal to Receive Rs. 6.8 Billion Boost from MCC for Infrastructure Growth [250103]
  
Butwal-Hetauda Connected By 220 kV [250102]
  
Govt finalizes USD 46.5 billion investment plan to produce 28,500 MW of electricity by 2035 [250102]
  
Power produced from projects in Marsyangdi watershed area to be brought to Kathmandu [250101]
  
PM Oli' China Visit: A Success For Business [250101]
  
NOC hikes petroleum price, petrol up by Rs 1 per litre [250101]
  
NEA to make alternative arrangements for electricity supply to the fast track project [250101]
  
Tanahun’s Markichowk 220 kV Substation Energized and Operational [250101]
  
  
 
 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries